Laserfiche WebLink
Site Background Information: Herman and Helens Marina <br /> Page 13 of 13 <br /> the field based upon field measurements and observations. On 27 September 2007, the <br /> excavation continued and proceeded laterally and vertically based upon field <br /> measurements and observations. Field observations indicated the HC-impacted soil did not <br /> extend to depths greater than approximately 6 feet bsg. Soil samples were collected from <br /> approximately 3.0, 4.5, and 5.5-feet bsg and transported for laboratory analysis. <br /> The results of soil and ground water sampling associated with the above excavation were <br /> reported in the AGE-prepared report Quarterly Report - Third Quarter 2007 dated 17 <br /> December 2007. Cleanup activities at the site are on-going. <br /> Advanced CeoEnvironmental,Inc. <br />