Laserfiche WebLink
Herman& Helen i Marina fiord Quertcr 1908 Groundwater Morntonng <br /> November 23 1998 <br /> Page. 10 <br /> Groundwater elevation mi,asuremcnts collected ,it the, site on 5c,ptcmher 30, 1998 indicated that the average <br /> I depth to groundwater was approximately 5 feet hg-,, which is consistent with groundwater elevation <br /> measurements collected on June 26 1998 Groundwater elevation contours for September 30 1998, indicate that <br /> the groundwater gradient at the site is generally t-onsistent with that measured on September 18, 1997, December <br /> 31, 1997, March 27 1998, and June 26 1998 <br /> Toluene was detected in the upstream surface, water sample (DDN) at a concentration of 2 3 p.g/l None of the <br /> I other B rE.X constituents or 1 PH-Cr were detected at or above the laboratory reported detection limits in this <br /> sample BTE X and rpt1-(, were not detected in any of the three remaining surtace water samples MTBE: was <br /> detected at or above the laboratory reported detection limit in all of the surfdLC water samples except the sample <br /> collected from the vicinity of the pump house in the island drainage channel None of the remaining selected <br /> gasoline oxygLnates/additives were detected at or above the laboratory reported detection limits in any of the <br /> surface water samples <br /> MTBh (2 0 µg/1) was the only analyte of interest detected at or above the laboratory reported detection limits in <br /> the marina's pre-treated drinking water (2 0 Itg/1) Chloroform, bromodichloromethane, and dibromo- <br /> chloromethanc were detected in the marina's treated drinking water at concentrations of 18, 6 1, and 3 0 }ig/l, <br /> respectively Chloroform, bromodichloromethane, and dibromochloromethane appear to be byproducts of the <br /> marina's drinking water treatment system <br /> As previously mentioned in Section 2 , Mr Ronald Rowe of the PEES/EIfD has requested that nine soil borings be <br /> installed to further evaluate the eastern extent of groundwater contamination at the site The installation and <br /> sampling of the soil borings is pending receipt of site access authorization from off-site property owners <br /> The next quarterly groundwater monitoring event is scheduled to be conducted in December, 1998 We <br /> anticipate reporting the results of the remaining work described in the work plan addendum concurrently with the <br /> IDecember, 1998, groundwater monitoring results Please call us at (209) 234-0518 with any questions <br /> Respectfully submitted, <br />' CONDOR EARTH TECHNOLOGIES, INC <br /> Todd C Hafner No 6430 onald F Kresse <br /> Senior GeologistcJ'J `Q alifornia Registered <br /> OQ�� <br /> Oc Ot\ Geologist#6430\k <br /> P 11432 H&Helen'slQuarterly Monitoring Reportsl1998-October\Rpt-Herm &Helens 11-23-98 doc <br /> ttitT CONDOR <br />