My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
2900 - Site Mitigation Program
>
PR0518132
>
ARCHIVED REPORTS XR0006989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:30:54 PM
Creation date
7/10/2019 11:45:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006989
RECORD_ID
PR0518132
PE
2960
FACILITY_ID
FA0013716
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
01
SITE_LOCATION
15135 EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' LUlIeLtLd from V11�-3 and MW--I M I HE was detLf tcd in M\k-4 M I BL tertiary butanol and <br /> 1 1 M F �v Lt L dLtLLtcd in VI W-2 No floating pi oduct sheen or petroleum hydrocarbon odor was <br /> IiitLd ni thL iuonrtot wLl[s IIll Lvaluation of intrinsiL bioreniediation parainetLrs was not <br /> tunduLtLd [ILLaUSL additional nionitoring was ncLessary to evaluate the potential foi uitruzsiL <br /> NO]Lmediatlon at ihL site <br />' (,inundwatci L-IL\atuOn mLasuienients Loilected at the SitL monitor wells on DeLetnber 31 1997 <br /> indiLatcd drat ihL aveiapt, depth troth the ground surface to groundwater was approximately 4 <br /> ILLI I he a\eragL depth to Wates at the site decreased by approximately 2 feet betvveen <br /> ScptLmbet 18 1497 and DccLmber 31 1997 {groundwater Llevation contours estimated using <br /> t11L depth-to-watLr measurements LolILLtLd on December 31 1997 Indicated that groundwater <br /> %v,k at thL ',ttL was ttLncrallr LoinsisiLnt vv[th the Lsti natLd flow on September 18, 1997 <br /> ()n V1,ILh 2- 1998 ( ondor pLr',onnel \verL on site to Londuct quarterly groundwater monitoring <br /> I abcnatory anal,,',es of gtoundwater tramples Lollected from thL site monitor wells indicated that <br />' BI FA I PH-(j and thL selectLd gasohnc oxygenates/additives were not detected at or abovL the <br /> laboratory ieported detection limits in the sample collected from MW-1 1-thanol, tertiary- <br /> butanol DIP[ I I BF- and f AML were not detected at or above the laboratory reported detection <br />' limits in anv of the groundwater samples Detection lunits for the analysis of the samples <br /> collected from MW-2 and MW-3 were raised, however due to relatively high concentrations of <br /> MI 131 in the samplLs collected trom those wells (as described below) Benzene and FPH-O <br />' weic not detected at or above. ratsLd detLLtion limits and low concentrations of fFX constituents <br /> wLte detLOLd In thL ',ample collected from MW-2 M'l131 was detected at i 10,000 ug/l in the <br /> \,[W-' ',amplL 13 1 1 X and 11'11-(1 wLrL not deteLtLd at or above the laboratory r(-ported <br /> dLtcciiOti Iiinits in the sample collected trom MW-3 M1131 was detected at 1,900 µg/I tri the <br /> Vl\k-+ saittple I PH-(j and 13 1 1 X Lon',titticnts werL deteLted in the ~ample collected from M W- <br /> VI II3[ was not detectLd at or abo�L thL [aboratory reported dcleLtton limit in tI1L YIW-4 <br />' sample No floating product sheen tit petroleum hydrocarbon odor was noted in the monitor <br /> wells <br />' Laboratory analytical results of the groundwater samples for the first quarter, 1998, monitoring <br /> event were generally consistent with historical quarterly groundwater analytical data MTBE <br /> concentrations in samples from MW-2, however increased by more than two orders of magnitude <br /> durini., the three sampling events conducted at the site <br />' (jroundwater elLvation mLamirements cnllLcted at the sste monitor wells on March 27, 1998 <br /> tndlcated that the average depth from the ground surface to groundwater was approximately 5 <br />' tLet f hL avLragL depth to water at the site increased by approximately 1 foot between December <br /> 31 1997 and March 27 1998 Oroundwater elevation contours estimated using the depth-to- <br /> watei measurements Lollcucd on March 27, 1998 indicated that groundwater gradient at the site <br /> W.-IS generally Lonststent with the estimated gradient on September 18, 1997, and December 31, <br /> 1997 <br />' In a telephone Lonversation on March 23 1998, Mr Ronald Rowe of the San Joaquin County <br /> Public Health Setvices/Ltivironmental health Department (PHS/GHD) indicated that based on his <br /> ieview of the ieport dated December 11, 1997 (referenced above), he was requesting that <br /> quarterly groundwater monitoring continue at the site 1-urthermore, he requested that a work <br /> plan be prepared lot conducting quarterly surface water sampling and additional investigation of <br /> the gasoline oxygenate/additive plume to the east of monitor well MW-2 Condor subsequently <br /> piepared the Work Plan - Aciditional Sod and Groundwater Investigation / Surface Water <br /> %uinphnir dated May 27 1998 In a faxed note dated June 1, 1998, Mr Rowe approved the work <br />
The URL can be used to link to this page
Your browser does not support the video tag.