| 
								     r
<br /> r															"'M ❑ri iii I�nJw du 3N"11 ih1ai}t'P""
<br />																	li,ssn rn k }1 STI    ulny
<br /> r  																			1LU
<br />  		(1n Au,rl,t 22   199111rLe 1ndropunLl, hormgs 11Lr,- drilled .tt 111L ,rte   t,.tsn1111L odors 1,erL noted In
<br /> r		LaLh  horLIWIL     I  tbOl,1torl  111,11\SLI,  ind1LatLd  thL  prLscni.e  tri  1 P11-(r  ind  13 1 1 X  in  thL  ,011  and
<br />  		grotl)ldwatLI  Sa111pIL,   ural\,iLd  from  caLII  hOILIMIL     Based  011  IhL  rLsultS  of  thL  Angtl,t  1995
<br />  		In1L,tl'-Iati011  ( oridol  rLulnlmLndLd addltlonal In1LStli,ation hL LondtiLled to L1alttatL tllt- LvtLnt 01 thL
<br /> r		IiNdroLaibon pIu111L   Ull   	79  1996  fl%L (tLi}ptohL horLh01Ls werL ln,talled at thL ,ItL   I hL rLstllts
<br />  		01 111L Iahor,itoi\ anal  u, lndlLatLd that L ILN nLd LonLL11tratl0t15 of  1 Pi I-(1  111 TX  and InLthN I ti-rtlary
<br />  		hut%I LthLr (M I HI ) 11LrL pIL,Lnt rn sod and '_,rourldwatLr SantplLs Lo]ILLtLd trorn thL northern portion 01
<br /> r		111L ,It, ,1111 111,11  ttlrtllLi' I111L,tl'1dtl0l1 was IILLL,sat,,  to L1alLlatL thL L\lLllt of  soil and groundwatLr
<br />  		L0TltatlllilatloI1
<br />  		BaSLd on thL rL,ults of t1iL (tcoprohL II1vLstigation  C undor rLLOInInLnded that monitor wLkS he 111SUILd
<br />  		it thL  SitL  to  nrlLstigatL  and  monitor  thL  lateral  LxtLnt  of  thL  gasohnL  and  d1LSLl  p1umL  ul  the
<br />  		graundwatLI   (hl '�,cptLmber 10  1997, ( ondor installed four monitor wells at thL SrtL    111L Repoi t -
<br />   		tcicdmonul 5011 e110 (,r011]7 1,1Utei Invevigution  dated Dcccmber 11,  1997  was prepared by ( ondor to
<br /> rdLscribe thL investigation Iwilts
<br />  		1-1'11-6  13TI X  Loilstrtuents  M rBI   tertiary  butanol  and tertiary amyi  methyl ether (TANMI ) were
<br /> r		dLtLLted Ill SoniL 01 thL ,oil and groundwater ',dillples LO11CLtLd during the investigation  (groundwater
<br /> 		L1Lvatton data lndicatLd that groundwater flow at thL ,itc was probably Lontrollcd by the vLr1 activL
<br />  		island dtalna_aL  puinpina  system  adlaLLnt  to  tine  sitL     I11L  ahovL  ILferenLed  report  rLLOIlnlriLndLd
<br /> 		quarterh groundwater monitoring surtaLe watLr sampling and Risk BasLd ( orrective Action (RB( A) to
<br /> 		furthLr LharactLrtiL thL site and to LvaluatL options for remediation or sitL L1o,urL
<br /> r		In a tLILphonL Loll�crsation on MarLh 23   1998  Mr  Ronald Rowe of the San  Joaquin ( ount}  Public
<br />  		Health       	nlrronmental Health Department (PHYI 111)) IndicatLd that  based oil his ILvtew of the
<br /> 		ILprnt datLd  1)tccmhLr  1 1   1997 (Ieterent ed  abole)  he was  requesting that quarterly groundwater
<br /> 		monitoring. Lontrnue at the Site   FurthermorL  hL requested that a work plan be prepared for Londucting
<br /> r		quarterly ,urtacc watLr sampling and additional investigation of the gasoline oxygenate/additive plume
<br /> 		to thL Last of monitor wLll MW-2   Condor subsequently prepared the Work Plan    lehlitional 'Iod and
<br /> r		Grollf7 ditutcf       			Wales  SLunphn(f dated May 27  1998   In a fax dated lune 1   1998
<br /> 		MI  Rewe approved thL work plan w ith the stipulation that a work plan addendum be prepared dLSLribing
<br /> 		Installation of additional borings to those proposLd in the work plan and grab Sampling of the HLrman &
<br /> 		Helen s Marina drinking water source   ( ondor subsequently prLpared the Work Plan Addendum  dated
<br /> IJuly 9  1998  In a fax dated July 27, 1998, Mi  Rowe approved the work plan addendum adding that both
<br /> 		the facility pre-treated drinking water and the past-treatment water should be sampled and analyzed by
<br /> 		appropriatL, methods
<br /> rOn OctobLr 1   1998  a ( ondor rept escntativL was on site to Londuct quarterly surface water sampling
<br /> 		aLtivities and LoI]Lct a sample of the marina s pre-tieated and treated drinking water from the facility s
<br /> I		water treatment system   From December  1998  through September 2000, Condor conducted quarterly
<br /> 		groundwatLr and suitace water sampling
<br /> 		In a letter dated JUIlL 30 2000 Mr  Rowe directed the submittal of a work plain amendment to modify the,
<br />  •	,cope of work pioposed in the above referenced work plan and work plan addendum   According to Mr
<br /> 		Rowe thL Wolk plan amendment was to describe vertical characterization of the potential MTBE plume
<br /> 		and he submitted by August  l   2000    1n addition  Mr  Rowe required that a report of the work be
<br /> I    �
<br />     t�    																	CONDOR
<br />
								 |