My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
2900 - Site Mitigation Program
>
PR0518132
>
ARCHIVED REPORTS XR0006989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 2:30:54 PM
Creation date
7/10/2019 11:45:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006989
RECORD_ID
PR0518132
PE
2960
FACILITY_ID
FA0013716
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
01
SITE_LOCATION
15135 EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti..a 111.1 r n our lit rtir lie.,r_ ur=i K�pnrt <br /> • II rrr n t ll.f.i tlurni <br /> [Sf.i qtr, ;Yf lki <br /> 1 <br /> su11MI1tLd by 14ptLnrbLr 1 '000 ( ondoi SuhSLyuLntlt piLparLd tliL 5101111 TiepolI u1►cl Itklenclum ro !hc <br /> J[mA Phw datLLl J11k '1 '000 1Y1r RM%L ipprovLd thL ��ork plan ainLridinLiit ni a tat dated \u4111st 3 <br /> X000 In .I tLlLpharnL wllli Mr RONN L on \U`1J51 i '000 ( ondor requested that thL <br /> tiuhnilttal datL toe thL ILport of findings hL LxtLndLd to ()Ltoller 6 2-000 Mr Rowe \crhallN LonLurrLd <br /> with lhf. L\tLrrtilun and iLLIULStLd that Condoi prLpare ,I ILttL: to doe-umcnt the Lnn,.CrSatlon ( ondor <br /> 1011MALd up \pith a IL(tLC datLd \iigust 3 ='000 1LLOrding. to 'vIr Andrew Smith of Herman h l lelen S <br /> Marina thL MYIILr,, of thL propLrl\ adjaLLnt to the east portion of tI1L site provided authorisation to <br /> aLLLSti thL Jpii,pLrtri on SLptLmbLr 8 2000 111L fscldwork portcon of thL Sol] and groundwatLr <br /> IMLStILatlon dLSLribLd In this FL])(-)rt \raS LondnLiLd ImmLdlatCly following autliorication to aLLLSS thL <br /> ofl-sttL picrpLrtN ( Oniprc.hLnsi\L sltL haLl.,round information rs inLludLd In AppLnditi B <br /> 3 h IELD kND AN kLYTIC kL 'METHODS <br /> I lIIs sLLtion inLludLs a dCsLription of the SIti- PILparation didling procedures, soil and groundwater <br /> sampling inLthods and Iabotatory analvtlLal mollodology for the soil and groundwater irwLstigation <br /> 3 1 SITF PRFPARATION <br /> PIMI to OIL tieldwoik authorization was ohtainLd horn RLLlamation D1s1rILt 42029 for thL w011. to bL <br />' i-Ond11LtLd m-at thL ILALL In addition a do 11111141 pLtmit was obtained tram the P115i1 111) I hL prciposLd <br /> sarrapliris' 1OLatIMIS \�LiL maiktd with Mute paint and t ndc.rrround S(,rNILL 1lLrt (1JSA) was notified 72 <br /> hours iii id\,111LL of thL IiLldwoik to IoLatc and idcntif\ underground utilities in aiid near thL work arLa <br /> I1OWCV l bLLaLISC thL pioposed boring locations were on private propLi-ty utllltICS contacted by t SA did <br /> not mark their lines past ptopertN houndaiies and on to the site flleretorc it was ti1L rLSponsibility of <br /> the props rty owncl to IoLatc and identity underground utilities in and near the work area 1 he PHY HD <br /> and thL Reclamation DistrtLt #2029 were notified of the fieldwork schedule 72 hours in advanLe <br /> 3 2 DRILLING PROCFDURES <br /> A Condor geologist was on Site to supervisL the work Prior to commencement of fieldwork a tailgate <br /> safOV n1LL1cng was hLld and a site-spCCItIL I{Lalth and Safety Plan was dISLUSsed with and pr'-sentcd to <br /> all field pLrsonncl for their signatures <br /> ht, in,�estigatiori me LidLd the advam enwnt of five shallow borings (DP-1, DP-2 DP-4 DP-5, and DP- <br /> 9) and Light deep bulings (DP-3 DP-6 through DP-8, HPI through HP-3, and SP-1) with either direct <br /> push technology ((,LoprobL sampling, sy5tC111) Hollow-stLin augLI, or hand auger the boring locations <br /> aiL shown in FigurL 2 \ppendix A Borings DP-1 and DP-2 were installed by drilling to a depth of <br /> appioxiinately five flet bLlow ground surface (bgs) with six-inch diameter hollow stem augei followed <br /> by boring with a hydiopuncla tool to the Hilal depth of approximately eleven feet bgs Direct push <br /> r technology was used to install DP-3 to a depth of approximately 31 feet bgs DP-4 to a depth of <br /> appioximatLly 12 teLt bgs and DP-7 to a depth of approximately 36 feet bgs Borings DP-5 and DP-6 <br /> were hand augcied to a depth of approximately six feet bgs because of close proximity to underground <br /> utilities AftLi dealing the Utilities dirLLt push technology was used to extend DP-5 and DP-6 to <br /> appioxiniately 16 and 32 fc,et bgs rc:speLtrvLly Boring DP-8 was hand augered to a depth of <br /> approximately six feet bgs to Lnable groundwater sampling while the direct push rig was used on another <br /> N&I <br /> L� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.