Laserfiche WebLink
' Work Plan-Soil and Groundwater Investigation <br /> Herman&Helen's Marina <br /> May 20, 1996 <br /> ' Page-4- <br /> Groundwater Investigation Report, prepared by Condor, dated September 26, 1995). Mr. Ronald <br /> ' Rowe of the PHS/EHD verbally approved the proposal for additional investigation during a telephone <br /> conversation with Condor in mid-February, 1996. <br /> ' 3.0 PROPOSED SCOPE OF WORK <br /> t This section includes a description of the proposed site preparation, Geoprobe boring, <br /> sampling, laboratory analysis, and reporting. <br /> 3.1 Site Preparation <br /> ' Prior to the fieldwork, authorization will be obtained from Reclamation District #2029 for the <br /> work to be conducted on the levee. Adjustments will be made to the scope-of-work, as needed, to <br /> ' satisfy the Reclamation District requirements. <br /> ' Upon receipt of authorization from the Reclamation District, drilling permits will be obtained <br /> from the PHS/EHD. The proposed sampling locations will be marked with white paint and <br /> Underground Service Alert (USA) will be notified at least 72 hours in advance of the fieldwork to <br /> locate and identify underground utilities in and near the work area. The PHS/EHD, the Reclamation <br /> District 92029 (or Reclamation District representative), and the CRWQCB will be notified of the <br /> ' fieldwork schedule at least 72 hours in advance. No work will take place on the levee during times <br /> when the Reclamation District suspects tides may create dangerous working conditions. <br /> 3.2 Drilling Procedures <br /> ' The fieldwork will include the boring of five (5) Geoprobe sampling points at the proposed <br /> locations shown on Figure 2, attached. The Geoprobes will be installed by Vironex Environmental of <br /> Foster City, California. A description of the Geoprobe sampling system is contained in Appendix B <br /> of this document. A Condor geologist will be on site to supervise all work. Prior to commencement <br /> ' of fieldwork, a tailgate safety meeting will be held and a site-specific Health and Safety Plan will be <br /> discussed with, and presented to, all crew members for their signatures. A copy of the Health and <br /> Safety Plan is contained in Appendix C of this document. <br /> 1 <br /> • CONDOR <br />