My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
3500 - Local Oversight Program
>
PR0544644
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:56:52 PM
Creation date
7/10/2019 4:44:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544644
PE
3529
FACILITY_ID
FA0005287
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
02
SITE_LOCATION
15135 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Work Plan-Soil and Groundwater Investigation <br /> Herman&Helen's Marina <br /> May 20, 1996 <br /> ' Page-6- <br /> The Geoprobes will be hydraulically advanced using 2-inch diameter push rods and a conical <br /> ' bit. The rods and bit will be thoroughly cleaned before each borehole is drilled using laboratory <br /> grade, non-phosphate detergent and hydrocarbon free water and double rinsing with hydrocarbon free <br /> ' water. The Geoprobes will be advanced to approximately three (3) feet below the shallow unconfined <br /> groundwater table. Groundwater is anticipated to be encountered at 6 to 13 feet below the ground <br /> ' surface (bgs). <br /> ' Upon completion of the drilling and sampling, the boreholes will be grouted with a cement <br /> slurry containing 3 to 5 percent bentonite. The slurry will be tremied into the borehole to avoid <br /> ' bridging. <br /> ' There is a potential for artesian flow at proposed boreholes located below the levee. If <br /> artesian flow is encountered, the borehole will be backfilled immediately with bentonite chips to <br /> ' within two (2) feet of the ground surface and the remaining borehole will be backfilled with a cement <br /> slurry containing 3 to 5 percent bentonite. Further boring will be aborted at any location where <br /> artesian flow is encountered. <br /> 3.3 Soil Sampling <br /> ' Soil samples will be collected at three (3) foot intervals for geological logging and field <br /> screening using a 1-inch diameter, split-spoon sampler fitted with four (4) clean, brass liners (see <br /> ' Appendix B for a description of the Geoprobe soil sampling system). The soil sampling equipment <br /> (i.e., split-spoon) will be cleaned prior to collecting each sample. The cleaning procedures will consist <br /> ' of washing the sampling spoon in a solution of laboratory-grade, non-phosphate detergent and <br /> hvdrocarbon-free water, and double-rinsing with hydrocarbon-free water. <br /> During the sampling, the split-spoon sampler will be hydraulically pushed at each interval. <br /> ' The uppermost liner will be discarded. One sample liner will be used for geological logging and for <br /> field screening using an organic vapor analyzer (OVA-FIDIPID) and the two (2) bottommost liners <br /> ' will be prepared, as described below, for shipment to the laboratory. The soil samples will be logged <br /> N� <br /> �, CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.