My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2900 - Site Mitigation Program
>
PR0524607
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:42:38 AM
Creation date
7/11/2019 9:09:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524607
PE
2950
FACILITY_ID
FA0016516
FACILITY_NAME
STOCKTON RAILYARD
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG 2 7 2004 <br /> ENVIRONMENT H ennedy/Jenks Consultants <br /> �ill�iSERViC' Engineers&Scientists <br /> 3336 Bradshaw Road <br /> Suite 140 <br /> Sacramento, CA 95827 <br /> 916-362-3251 <br /> FAX 916-362-9915 <br /> 20 August 2004 <br /> Mr. Gerald Djuth <br /> Associate Engineering Geologist <br /> Central Valley Region <br /> California Regional Water Quality Control Board <br /> 11020 Sun Center Drive#200 <br /> Rancho Cordova, California 95670-6114 <br /> Subject: Schedule to Develop Work Plan <br /> Union Pacific Railroad Company, Stockton Yard <br /> K/J 032777*16 <br /> Dear Mr. Djuth: <br /> This letter has been prepared in response to the 9 August 2004 letter from the California Regional Water <br /> Quality Control Board (Regional Board) requesting a schedule to develop a work plan for Union Pacific <br /> Railroad Company's (Union Pacific) Stockton Yard (Site). On behalf of Union Pacific, Kennedy/Jenks <br /> Consultants (Kennedy/Jenks)will prepare a work plan which describes the objectives and procedures to <br /> accomplish the following tasks, as requested by the Regional Board: <br /> • Re-wash the drop inlet and culvert near Switch 14 of the Site. <br /> • Sample water from the culvert for analysis of total petroleum hydrocarbons as diesel. <br /> • Inventory existing drop inlets. <br /> • Prepare a map showing drainage patterns at the Site. <br /> • Prepare a map showing maintenance facilities and storage tanks. <br /> • Describe existing stormwater runoff management practices. <br /> • Prepare a proposal to monitor runoff from the Site to surface water courses. <br /> Kennedy/Jenks proposes to submit the work plan to the Regional Board no later than 15 October 2004. <br /> In order to complete the first tasks with time to evaluate the results and plan appropriate actions, <br /> Kennedy/Jenks may undertake these tasks prior to the preparation and submittal of the work plan. <br /> If you have any questions or comments, please contact me at(916)362-3251. <br /> Very truly yours, <br /> KENNEDY/JENKS CONSULTANTS <br /> �- Ja e , R.G. <br /> Pr anager <br /> cc: Mr. Harlan Knoll, San Joaquin Environmental Health Department, Stockton <br /> Mr. Jim Levy, Union Pacific Railroad Company <br /> g:ladminassNobs120031032777.16_union pacific-stockton yard106-comspnd16.06 other workplan_schedule_djuth.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.