Laserfiche WebLink
1 <br /> Section 2: Prefield Activities <br /> ' Prior to initiating the field activities as defined in this section, Kennedy/Jenks will complete the <br /> following: <br /> • Update the current Site-specific Health and Safety Plan (Appendix A) to identify the <br /> chemical and physical hazards associated with the assessment activities. <br /> ' • Inspect the 8th Street Storage Area for potential conflicts with subsurface utilities by <br /> performing a utility clearance check prior to advancement of soil borings. The utility <br /> clearance will be done by contacting Underground Services Alert for utility clearance a <br /> ' minimum of two working days before the scheduled field work. In addition, <br /> Kennedy/Jenks will contract with a private utility locating firm to check for utilities. <br /> ' • Complete Union Pacific fiber optic notifications. <br /> • Notify Union Pacific of field activities at the Site to minimize disruptions to Site <br /> operations, and for safety precautions. <br /> ' • Notify 9 the Regional Water Quality Control Board of planned activities. <br /> r • Obtain a soil boring permit from San Joaquin County Environmental Health Department. <br /> • Contract with Subtronic Corporation (Subtronic) to provide geophysical survey and utility <br /> ' search services. <br /> • Coordinate with Vironex (C-57 License No. 705927) to advance the soil borings. <br /> 1 <br /> 1 <br /> r <br /> r <br /> r <br /> r <br /> r <br /> ' Soil Investigation Work Plan Page 2 <br /> Union Pacific Railroad Company, Stockton Railyard, Stockton, California <br /> jA20031032777.16 union pacific-stockton yard109-reports\wplan_soilboringltextlwp_soil_1003.doc <br />