My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012678
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
3500 - Local Oversight Program
>
PR0544645
>
ARCHIVED REPORTS XR0012678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 12:40:53 PM
Creation date
7/11/2019 10:11:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012678
RECORD_ID
PR0544645
PE
3528
FACILITY_ID
FA0004979
FACILITY_NAME
CIVIC CENTER PARKING*
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ ` a <br /> ano <br /> 1 7.0 PROJECT SCHEDULE <br /> _ The project scope is divided into five major task areas: (1) <br /> preliminary engineering, (2) detailed engineering, (3) permit <br /> acquisition, (4) system installation and (5) system operation. <br /> Preliminary engineering includes development of the design basis, <br /> determination of regulatory constraints, development of the site <br /> Health and Safety Plan and the process flow diagrams. This task is <br /> estimated to require less than one week. <br /> Detailed engineering includes the selection of major equipment, <br /> development of piping, electrical and instrumentation diagrarns, <br /> compound layout, emergency action plan requirements and construction <br /> details. Major equipment procurement is carried out as part of this <br /> task which is estimated to require approximately two weaks. <br /> Construction permit applications will be submitted to the City of <br /> Stockton and discharge permit applications have been submitted to the <br /> regional Water Quality Control Boe,.d and the Stockton Municipal <br /> Utilities District. A dual Permitting track is being pursued in <br /> order to provide the maximum flexibilityin r, <br /> Injection of the treated water into u gproject scheduling. <br /> pgradient well MWS is �.1�e <br /> preferred disposal alternative, however, if for any reason Waste <br /> Discharge Requirements cannot be obtained or are delayed discharge to <br /> the municipal wastewater system will be Implemented. It is <br /> anticipated that it will take approximately 4 to 10 weeks --f- <br /> submittal and approval of the permits. or <br /> System installation includes the preparation of the site, <br /> construction of the treatment compound, setting of the pumps and the <br /> .� installation of major equipment, electrical components and control <br /> system and the initial system shakedown. Installation is expected to <br /> "? take approximately 2 weeks from the issuance of the building permit. <br /> Full system operation will continue afrer the initial shakedown and <br /> adjustment period. Operation will .include a monitoring and sampling <br /> program to assess the progress of the extraction and treatment <br /> r process. All reporting will be performed in accordance with <br /> regulatory agency guidelines. <br /> The overall project schedule is dependent upon certain regulatory <br /> milestones. Initiation of the above schedule is proposed within one <br /> week of receiving approval of the Remedial Action Plan. <br /> Weber Point Prop-irt7 - 475 <br /> - - R20P"741.TLP _ 13 - - . <br />
The URL can be used to link to this page
Your browser does not support the video tag.