Laserfiche WebLink
r <br /> L ww <br /> G,ound� for Monnor4g and Romodmuon Statue Rapart N Q� <br /> Second quarter 1994 <br /> 141 N EI Dorado Stoddon Cahfamia <br /> A separate electric meter to track remediation system utility costs was installed <br /> I <br /> Site remediation systems, consisting of groundwater recovery with discharge to sewer, <br /> GO, and soil venting with granular activated carbon (GAC) emissions control, are <br /> currently in operation <br /> Soil Vent System Operation <br /> The venting system operation (extraction from VEW-1 , VEW-2, VEW-3, and VEW-4) <br /> commenced on June 23, 1993 Vapor extraction from monitoring well MW-3 commenced <br /> on July 8, 1994 Fugro has performed soil vent system monitoring according to the air <br /> permit (Permit to Operate No N-1133-2-0 and Authority to Construct Permit <br /> No N-1133-2-1) issued by the San Joaquin Valley Unified Air Pollution Control District <br /> System monitoring results and calculations are included as Attachment 2 Between <br /> April 5 and June 1 , 1994, an estimated 159 pounds of TPH (as gasoline) were extracted <br /> based on laboratory analytical results During the period between June 23, 1993 and <br /> June 1 , 1994, cumulative TPH (as gasoline) extraction from the soil is estimated at 1 ,406 <br /> pounds based on laboratory analytical results System monitoring information including <br /> airflow, hydrocarbon concentrations, and extraction rates is included in Attachment 2 <br /> Groundwater Pumping With Discharge to Sanitary Sewer <br /> The groundwater recovery system operation (pumping from wells RW-1 and RW-2) <br /> commenced on March 2, 1993 Quarterly sewer discharge sampling and reporting has <br /> been performed according to the discharge permit issued by the City of Stockton <br /> Municipal Utilities Department Sewer discharge results since system startup in <br /> March 1993 and a copy of the most recent quarterly sewer discharge report are included <br /> as Attachment 3 During the period between March 2, 1993 and July 7, 1994, an <br /> estimated 4,476,793 gallons of ground water containing dissolved hydrocarbons were <br /> pumped from RW-1 and RW-2 and discharged into the sewer Total Petroleum <br /> Hydrocarbon concentrations ranged from less than 0 05 to 1 5 parts per million (ppm), <br /> benzene concentrations ranged from 0 0024 to 0 023 ppm System monitoring <br /> information including pumping rates, hydrocarbon concentrations, and discharge to the <br /> sanitary sewer is included in Attachment 3 <br /> Groundwater Oxygenation_System Startup <br /> Operation of the GO system commenced on July 11, 1994 with air diffusers in operation <br /> in wells MW-1 MW-2, and MW-3 Results of GO system startup are presented as <br /> Attachment 4 After evaluating system data, the air diffusers in wells MW-4, RW-1 , and <br /> RW-2 are expected to be activated <br /> Remediation system operation and monitoring will be continued per regulatory <br /> requirements <br /> 93473011 ASR 2 <br />