My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
222
>
2900 - Site Mitigation Program
>
PR0009146
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:00:36 PM
Creation date
7/11/2019 11:17:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009146
PE
2960
FACILITY_ID
FA0004093
FACILITY_NAME
LIGHTHOUSE SCHOOL
STREET_NUMBER
222
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13910022
CURRENT_STATUS
02
SITE_LOCATION
222 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
222 North EI Dorado Street <br /> Page 2 <br /> September 14,1999 <br /> Underground Service Alert and Geophysical Investigation <br /> As required by law, Underground Service Alert (USA) will be contacted 48 hours prior to <br /> initiation of work. <br /> Abandonment. <br /> Two, two-inch monitoring wells and one, four-inch monitoring well will be abandoned. An <br /> augur will be placed over the existing well casing and drilled to the total depth of the well. <br /> The two-inch wells will be abandoned using an eight-inch augur, and the four-inch well will <br /> be abandoned using a ten-inch augur. Once the drilling is complete all soil cuttings will be <br /> drummed for disposal at the nearest landfill. As required by the landfill, onecomposite <br /> om <br /> sample collected frthe drums of waste will be analyzed for To al lead, Total Petroleum <br /> Hydrocarbons as Gasoline (TPH-G), for Benzene, Toluene, Ethyl benzene, and Xylene (BTEX) <br /> by EPA method 801518020. For budgetary purposes, it will be estimated that 11 drums of soil <br /> waste and 2 drums of decontamination water will be generated. <br /> Site Restoration <br /> All holes will be backfilled with portland cement and patched with asphalt following the <br /> abandonment activities. <br /> ASSESSMENT REPORT <br /> At the conclusion of the abandonment activities and disposal of soil and decontamination <br /> water waste, a letter will be prepared and sent to the SJCEHD and the CVRWQCB with a <br /> request for final closure. <br /> Should you have any questions or require further information, please feel free to contact me <br /> at (949) 644-2690. <br /> Respectfully Submitted, <br /> Avalon Environmental Consultants <br /> u2 <br /> Trevor Santochi <br /> Principal <br /> CC: Mr. Brian Walker V.P. (Washington Mutual Bank) <br /> Mr. Philip Isorena (CVRWQCB) <br /> Ms. Lori Duncan (SJCEHD) <br />
The URL can be used to link to this page
Your browser does not support the video tag.