My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007617
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
3500 - Local Oversight Program
>
PR0544650
>
ARCHIVED REPORTS XR0007617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:20:41 PM
Creation date
7/11/2019 1:16:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007617
RECORD_ID
PR0544650
PE
3528
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 1 <br /> 07 February 1999 <br /> AGE-NC Project No �95-0135 <br /> Page 4 of 4 <br /> • The fuel additives DIPE, TAME, ETBE and MTBE were detected on the site MTBE was <br /> detected at concentrations exceeding the State of California action level <br /> • 4 I <br /> 5.0. RECOMMENDATIONS <br /> F <br /> Based on the results of this and previous investigations, AGE recommends <br /> • Continued quarterly monitoring of the site The next monitoring event should conducted in <br /> March 2000 <br /> Additional soil borings should be installed to assess ,the lateral extent of hydrocarbon- <br /> impacted soil north of the former UST area and in the area of well MW-1 <br /> • Additional ground water monitoring wells should be installed to determine the lateral extent <br /> of hydrocarbon-impacted ground water, south of the former UST area and north and west of <br /> well MW-1 Additional ground water investigation is required northeast and northwest of the <br /> site <br /> • Once the soil and ground water impact has been defined, a work plan should be prepared for <br /> feasibility testing to evaluate various remedial alternatives at the site <br /> G.D. LIMITATIONS <br /> I 5 <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based on k <br />�+ analytical results provided,by an independent laboratory Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of_ <br /> I available data points (i a ground water samples) and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report ; <br /> r 5 <br /> r � <br /> V J 1 s <br /> 5 <br /> Advanced GeoEnvironmental;Enc y <br /> 5 r <br /> I � <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.