Laserfiche WebLink
SOW <br /> REC <br /> a 10 <br /> UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page t of 6) <br /> EN in El installation Test [I Repair Test ❑Six Month Test 0 36 Month Test <br /> A au I. FACILITY INFORMATION <br /> CERS ID Date of Secondary Containment Test <br /> 10180627 10/22/2018 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Cherokee Lane Service Station-Arco <br /> Business Site Address City ZIP Code <br /> 900 South Cherokee Lane Lodi 95240 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification) Phone# <br /> Benjamin Duncan (707) 621-0378 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> Afford-a-test/90-1120 5246802-UT 4/3/2019 <br /> III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> TANK ID: (By tank number, stored product,etc.) A T-1&2-87-91 B T-3&4-87-Diesel C D <br /> Tank Containment <br /> Tightness Test Result Z Pass ❑ Fail ❑ NA Z Pass ❑ Fail ❑ NA ❑ Pass ❑Fail ❑NA ❑Pass ❑Fail ❑NA <br /> Product Piping Containment <br /> Tightness Test Result Z Pass ❑ Fail ❑NA E Pass ❑Fail ❑NA Z Pass ❑Fail ❑NA Z Pass ❑Fail ❑NA <br /> Communication Test Result ❑Pass ❑Fail Z NA ❑Pass ❑Fail E NA ❑ Pass ❑Fail Z NA ❑Pass ❑Fail E NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail E NA ❑Pass ❑Fail E NA ❑ Pass ❑Fail Z NA ❑Pass ❑Fail E NA <br /> Communication Test Result ❑ Pass ❑Fail Z NA ❑Pass ❑Fail E NA ❑Pass ❑Fail E NA ❑Pass ❑Fail E NA <br /> Vent Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail E NA ❑Pass ❑Fail Z NA ❑ Pass ❑ Fail E NA ❑Pass ❑Fail Z NA <br /> Communication Test Result ❑Pass ❑Fail Z NA ❑ Pass ❑Fail Z NA ❑ Pass ❑Fail Z NA ❑Pass ❑Fail Z NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail E NA ❑Pass ❑Fail Z NA ❑Pass ❑Fail Z NA ❑Pass ❑Fail E NA <br /> Communication Test Result ❑Pass ❑Fail Z NA ❑ Pass ❑Fail Z NA ❑Pass ❑Fail E NA ❑Pass ❑Fail E NA <br /> Turbine/Product Piping Sump <br /> Tightness Test Result E Pass ❑Fail ❑NA Z Pass ❑ Fail ❑ NA E Pass ❑ Fail ❑ NA Z Pass ❑Fail ❑ NA <br /> Fill Riser Sump <br /> Tightness Test Result ❑Pass ❑ Fail Z NA ❑ Pass ❑Fail Z NA ❑Pass ❑Fail E NA ❑ Pass ❑Fail E NA <br /> VENT/TRANSITION SUMP ID: a b C d <br /> Tightness Test Result ❑Pass ❑Fail Z NA ❑ Pass ❑Fail E NA ❑Pass ❑Fail E NA ❑Pass ❑Fail Z NA <br /> UDC ID: 1 1&2 2 3&4 3 5&6 4 7&8 <br /> Tightness Test Result E Pass ❑Fail ❑NA E Pass ❑ Fail ❑NA Z Pass ❑Fail ❑NA E Pass ❑Fail ❑NA <br /> UDC ID: 5 9 6 9-Satelite 7 8 <br /> Tightness Test Result E Pass ❑ Fail ❑NAZ Pass ❑ Fail ❑ NA ❑Pass ❑ Fail ❑ NA ❑ Pass ❑Fail ❑ NA <br /> UDC ID: 9 10 11 12 <br /> Tightness Test Result ❑ Pass ❑ Fail ❑NA LEI Pass ❑ Fail ❑ NA ❑Pass ❑ Fail ❑NA ❑ Pass ❑Fail ❑ NA <br /> All items marked`Fail"or"NA"must be explained in their respective"COMMENTS"section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the secondary containment was tested in accordance with California Code of Regulations,Title 23,Division <br /> 3,Chapter 16, Section 2637 and all the informations contained herein is accurate. <br /> UST Service Technician Signature <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=Intemabonal Code Coundl,NA=Not Applicable,UDC=Under- <br /> Dispenser Containment <br />