Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 2 of 6) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer I Identify Tank ID from Section III for each Manufacturer <br /> Trusco/Glass Steel A X❑ B X❑ IC ❑ I D ❑ <br /> A ❑ B I C I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑x Industry Code or Engineering Standard(Specify): PEI/RP900/Steel Tank/-6" Hg. 1 Hour <br /> ❑Engineered Method (Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Tank Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> VI. COMMENTS <br /> Provide any additional comments here. <br /> VII. PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Smith Fibercast FRP A ❑x I B x❑ IC D ❑x <br /> A ❑ B ❑ I C ❑ D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑x Industry Code or Engineering Standard(Specify): PEI/RP900/Fiberglass Pipe/5 Psi 1 hour <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Product Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Interstitial Communication Verification Method Used: <br /> VIII. COMMENTS <br /> Provide any additional comments here. <br /> It is not alway possible to verify Test Pressure continuity when the Under Dispenser Containment has bottom Penetrations <br /> for the Piping and have no access to the Secondary portion of the Piping to allow verification of continuity without <br /> breeching the integrity of the sealed system at the UDC end of the Piping Run. <br /> ID=Identification <br />