Laserfiche WebLink
! L <br /> .� Ly Report-Soil and Groundwater Investigation <br /> Gateway Pro' <br /> 1 4 dry <br /> April 10,220z0 <br /> Page - <br /> indicated that the site had been assigned to the SJCPHS/EHD Local Oversight Program_ At the request <br /> of Mr. Ron Palznquist of the City of Stockton, Ms _Suzanne Sullivan of Suzanne Sullivan Real Property <br /> _ - Services,:and-Ms.:Deedee`Antypas of Siegfried, Condor prepared the Work Plan—Soil and.Groundwater <br /> Sampling by--Direct Push (Geoprobe),-dated March 10, 2000. Ms.-.Duncan of the SJCPHS/EHD <br /> approved the work plan in a—facsimile transmission dated March 20,2000. <br /> INV <br /> 3. FIELD � . _ - _ _... • � r - <br /> INVESTIGATIONAND LABORATORY ANALYTICAL RESULTS <br /> 3.1 SITE PREPARATION <br /> Condor scheduled and coordinated the field activities through Siegfried'4 Prior to initiating the fieldwork, <br /> � .. <br /> Condor completed a'dnliirig permit application and obtained the required permit from.the SJCPHS/EHD. <br /> In addition, Condor applied for and obtained an encroachment permit from.the City of Stockton Public. <br /> Works Department for the boring to be drilled'in'El Dorado Street. The proposed boring locations were <br /> marked with white paint and UndergroundService Alert (USA) was notified approximately 72 hours in <br /> advance of the fieldwork to locate and identify underground utilities in and near the location of each <br /> - - <br /> proposed bofing at the site :Y - k, <br /> 3.2 GEOPROBE BORINGS y <br /> Five Geoprobe borings (GPI through GP5) were installed at the site on March 30 and 31, 2000; by V & <br /> _.W .Drilling, Inc. of:Isletoii, California. Prior to commencement of the fieldwork; a tailgate safety <br /> meeting was held and a site-specific Health and Safety Plan was discussed with, and presented to, all <br /> field personnel for their si ,. atures. Geo robe boring GP-; was installed approximately in the center of <br /> P _ gn P g . _ PP y <br /> the location of former Tank 2. Geoprobe borings GP2, GP3, GP4 and GP5 were installed approximately <br /> , .20 feet to the east, south, west and north-of-GPI,respectively. The Geoprobe boring locations are shown <br /> P P g <br /> in Figure 2,"Appendix A. <br /> The'upper approximately:four feet of each baring was advanced with a two.-inch diameter hand-auger to <br /> T _ assist with clearing each boring of.near surface obstructions (including utilities that'ma have not been <br /> ( g Y <br /> identified in.the USA process).;The Geoprobe borings were then Hydraulically advanced using a 2-inch. <br /> y diameter. conicai bit'.'._: The rods :and bit.were decontaminated before each boring was:drilled using_ <br /> -T. laboratory grade, _non phosphate detergent and de-ionized water and double.rinsing°with de-ionized <br /> L1� CONDOR <br />