My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
325
>
3500 - Local Oversight Program
>
PR0544652
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:21:46 PM
Creation date
7/11/2019 1:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544652
PE
3528
FACILITY_ID
FA0012146
FACILITY_NAME
GATEWAY PROJECT
STREET_NUMBER
325
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14906112
CURRENT_STATUS
02
SITE_LOCATION
325 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ M <br /> Work Plan-Soil and Groundwater Investigation <br /> Gateway Project,City of Stockton <br /> Match 10,2000 <br /> �- <br /> Page-4- <br /> 3.4 GEOPROBE GROUNDWATER-SAMPLING <br /> �� <br /> If groundwater is encountered in the borings, one groundwater sample will be collected from each boring-_`- <br /> - - <br /> - with the Geoprobe groundwater sampler. The samplers'utilizes- a sealed, water-tight;` stainless'steel <br /> Sample chamber and'PVC screen which is isolated from the.surrounding environment as the sampler is <br /> advanced. When the-desired.,depth for collection. of.a -groundwater sample is_ reached the sample <br /> chamber is opened li <br />
The URL can be used to link to this page
Your browser does not support the video tag.