My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
400
>
2900 - Site Mitigation Program
>
PR0506606
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:20:38 PM
Creation date
7/11/2019 2:15:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506606
PE
2950
FACILITY_ID
FA0007533
FACILITY_NAME
WASSERMAN FAMILY PARTNERSHIP
STREET_NUMBER
400
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13907009
CURRENT_STATUS
02
SITE_LOCATION
400 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R IO N <br /> 1.2 Objectives and Scope of Work <br /> The objective of the planned site assessment activities are to delineate the nature and <br /> extent of impacted groundwater at the site. Orion will drill and install three groundwater <br /> monitoring wells and perform two groundwater monitoring events separated by three <br /> Months to meet this objective. It is anticipated that these steps will demonstrate a low risk <br /> '1 site based upon plume stability and previous work showing no significant receptor <br /> �+ impacts. The proposed scope of work will include the following tasks: <br /> AI <br /> ❑ Mark monitoring well locations at the site and notify Underground Service <br /> Alert (USA) to identify subsurface utilities <br /> L <br /> ❑ Obtain encroachment and revocable permits plus financial security deposit <br /> from the City of- Stockton for installation of two wells in sidewalk portions <br /> of El Dorado Street <br /> �`. ❑ Obtain monitoring well permits from the SJCPHS-EHD <br /> L <br /> ❑ Drill and install three groundwater monitoring wells to a depth of <br /> approximately 35-40 feet below grade <br /> ❑ Perform two groundwater sampling events; one immediately following <br /> installation and development of the wells and one in approximately three <br /> months after well installation <br /> ❑ Analyze the groundwater samples at a State-certified laboratory for <br /> ❑ Total petroleum hydrocarbons as gasoline (TPHg) using modified <br /> U.S. Environmental Protection Agency (EPA) Method 8015 <br /> ❑ BTEX and methyl tert-butyl ether (MTBE) using EPA Method 8020 <br /> ❑ Analyze soil samples for TPHg, BTEX and MTBE and dispose of the drilling <br /> I residuals and well development and purge water <br /> ❑ Perform health and safety monitoring during field activities <br /> ❑ Evaluate groundwater monitoring data and prepare a report. <br /> ( 1 SABFS\STOCKTON\WKP041.DOC 10/27/99 1-2 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.