My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
400
>
2900 - Site Mitigation Program
>
PR0506606
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:20:38 PM
Creation date
7/11/2019 2:15:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506606
PE
2950
FACILITY_ID
FA0007533
FACILITY_NAME
WASSERMAN FAMILY PARTNERSHIP
STREET_NUMBER
400
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13907009
CURRENT_STATUS
02
SITE_LOCATION
400 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> QRION, <br /> 2.0 GROUNDWATER INVESTIGATION ACTIVITIES <br /> i <br /> �y Orion's proposed field activities for the groundwater -investigation are described in the <br /> following sections. <br /> 2.1 Health and Safety <br /> A site-specific Health and Safety Plan (HSP) has been prepared for this investigation and is <br /> included as Appendix A. The HSP presents procedures for personnel and equipment <br /> safety, medical surveillance, personal protection, air-quality monitoring, exposure control, <br /> emergency response procedures, and general work practices. <br /> Uh <br /> Before beginning work at' the site, a site safety meeting will be conducted. Field <br /> g g <br /> personnel will review the HSP and sign the accompanying acknowledgment form. Field <br /> personnel will be required to comply with the HSP throughout performance of site <br /> assessment activities. <br /> Based on the site history -and potential chemicals of concern, field activities will be <br /> Linitiated in Level D personal protective equipment (PPE). During ,field activities, the <br /> breathing zone of field personnel will be monitored using a field photoionization device <br /> (PID). If breathing zone PID readings indicate elevated levels of organic vapors, PPE will <br /> be upgraded accordingly. Breathing zone readings will be recorded on the boring logs. <br /> 2.2 Monitoring Well Installation <br /> Before initiating drilling activities, Orion will mark the well locations on site and contact <br /> ' Underground Service Alert to clear the area of subsurface lines and utilities. Orion will <br /> also obtain well permits from the S)CEHD and encroachment permits from the City of <br /> +: Stockton.. <br /> 1 <br /> L <br /> S:\BF..S\STOCKTON\WKP001.DOC 10/27/99 2-1 <br /> Ll <br />
The URL can be used to link to this page
Your browser does not support the video tag.