My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007668
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
400
>
3500 - Local Oversight Program
>
PR0544653
>
ARCHIVED REPORTS XR0007668
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 7:18:10 PM
Creation date
7/11/2019 2:42:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007668
RECORD_ID
PR0544653
PE
3528
FACILITY_ID
FA0004695
FACILITY_NAME
BRIDGESTONE/FIRESTONE #3573
STREET_NUMBER
400
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
13907009
CURRENT_STATUS
02
SITE_LOCATION
400 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Firestone Servwee Center 400 North El Dorado, Stockton, Cahfornia <br /> February 2, 1994 Soil Remediation Plan—2072.01 Page 6 of 6 <br /> Once site closure is approved, the wells will be closed in place according to <br /> standard industry practices The closure will consist of removing the well covers, <br /> disconnecting the vacuum system piping, filling each well with a bentonite/cement <br /> slurry, and capping each well with concrete The buried connection pipe will be <br /> capped with grout and abandoned in place The disturbed areas will be resurfaced <br /> with concrete The exposed connection piping and the VES unit will be removed <br /> from the site <br />' <br /> 40 SCHEDULE <br />' Upon approval, Ryan-Murphy will proceed with implementation of remediation as <br /> described herein It is anticipated that installation of the system can occur within six <br /> weeks of approval of the Soil Remediation Plan, pending coordination with the drilling and <br />' installation subcontractor, availability of the VES unit, and receipt of a Revocable Permit <br /> System startup is dependent upon receipt of an air emission permit It is projected that <br /> system installation and startup will be completed in two days <br />' 5 0 REVIEW OF SOIL REMEDIATION PLAN <br /> As required by agencies implementing the RCRA Subtitle I regulations which govern UST <br /> release investigations in California, this Soil Remediation Plan has been reviewed by the <br /> Mundersigned professional geologist registered in California <br /> Based on currently available data concerning the site and the apparent release of regulated <br /> substances from a UST systeIbis Soil Remediation Plan conforms to standard, <br /> accepted groundwater and is practices currently in use in California at <br /> this time con,�� <br /> Nks <br /> 3•- <br /> i <br /> Wm. Curtis Wells, CP E ;�C�„15� <br /> i Consulting Groundwater E irreering G t <br /> CA Registration #1338 sTgrE 9_ C `,�� <br /> W C Wells & Co Inc --- <br /> ' 2010 West 120th Avenue <br /> Denver, Colorado 80234 <br /> 3031466-3801 <br /> RYAN-MURPHY, INCORPORATED Dearer <br /> F.nra�omoaeatal Coastractioa Managenu�t Las <br /> Angebsr <br />
The URL can be used to link to this page
Your browser does not support the video tag.