My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007676
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
400
>
3500 - Local Oversight Program
>
PR0544653
>
ARCHIVED REPORTS XR0007676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 7:14:59 PM
Creation date
7/11/2019 2:44:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007676
RECORD_ID
PR0544653
PE
3528
FACILITY_ID
FA0004695
FACILITY_NAME
BRIDGESTONE/FIRESTONE #3573
STREET_NUMBER
400
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
13907009
CURRENT_STATUS
02
SITE_LOCATION
400 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I1� I N <br /> • 2.0 GROUNDWATER INVESTIGATION ACTIVITIES <br /> Orion's proposed field activities for the groundwater investigation are described in the <br /> following sections <br /> 2.1 Health and Safety <br />' A site-specific Health and Safety Plan (HSP) has been prepared for this investigation and is <br /> included as Appendix A The HSP presents procedures for personnel and equipment <br />' safety, medical surveillance, personal protection, air-quality monitoring, exposure control, <br /> emergency response procedures, and general work practices <br />' Before beginning work at the site a site safety meeting will be conducted Field <br /> g g Y g <br /> personnel will review the HSP and sign the accompanying acknowledgment form Field <br /> personnel will be required to comply with the HSP throughout performance of site <br /> assessment activities <br /> Based on the site history and potential chemicals of concern, field activities will be <br /> initiated in Level D personal protective equipment (PPE) During field activities, the <br /> breathing zone of field personnel will be monitored using a field photoionization device <br /> (PID) If breathing zone PID readings indicate elevated levels of organic vapors, PPE will <br /> be upgraded accordingly Breathing zone readings will be recorded on the boring logs <br /> 2.2 Monitoring Well Installation <br /> Before initiating drilling activities, Orion will mark the well location on site and contact <br /> Underground Service Alert to clear the area of subsurface lines and utilities Orion will <br /> also obtain a well permit from the SJCEHD <br /> S\8FS\STOCKTON\WKP003 DOC 03/22/01 2_' <br />
The URL can be used to link to this page
Your browser does not support the video tag.