Laserfiche WebLink
�} Mr Harlin Knoll ORION <br /> San Joaquin County Environmental Health Division <br /> 7 July 2000 <br /> • Page 3 <br />' The remainder of the well annulus above the top screened interval in the wells was filled <br /> with bentonite grout to approximately 1 foot below grade <br />' The wells were developed on 25 January 2000 by surging and bailing to (1 ) remove fines <br /> from the filter pack and well screen and (2) reduce sediment in the water At least <br /> 5 casing volumes of water were removed from each well during development, totaling <br /> approximately 36 gallons The well development logs are included in Attachment 2 <br /> Soil Sampling and Analytical Results <br /> Soil sampling and analytical procedures were conducted in accordance with Orion's <br /> work plan Details of the drilling and sampling activities are included in Attachment 3 <br /> Soil samples were collected at 5 feet below ground surface and at approximate 5-foot <br /> intervals thereafter Selected soil samples were analyzed by Positive Lab Service of Los <br /> Angeles, California (Positive), a State-certified laboratory The samples were analyzed <br /> for TPHg using modified EPA Method 8015, and for BTEX and MTBE using EPA Method <br /> 8260 Analytical laboratory reports and chain-of-custody forms for the January 2000 <br /> drilling activities are included in Attachment 4 and are summarized on Table 1 <br />�`• One soil sample was selected and analyzed from each boring during drilling activities <br /> The soil sample from MW-1 , at a depth of 20 feet below grade, contained the only <br /> detectable concentration of MTBE at 99 micrograms per kilogram (µg/kg) The soil <br /> samples analyzed from MW-2 and MW-3 for MTBE were below detection limits at <br /> depths of 35 and 15 feet below grade, respectively TPHg and BTEX were not detected <br /> in any of the other soil samples analyzed from the borings <br /> Groundwater Sampling y and Analytical Results <br /> p <br /> Groundwater sampling and analytical procedures were conducted in accordance with <br /> Orion's work plan Details of the groundwater sampling procedures are included in <br /> Attachment 5 Groundwater samples were analyzed by Positive Lab Service The <br />' samples were analyzed for TPHg using modified EPA Method 8015, and for BTEX and <br /> MTBE using EPA Method 8260 Analytical laboratory reports and chain-of-custody <br /> forms for the January 2000 (first round) and May 2000 (second round) sampling activities <br />�t are included in Attachment 4 and are summarized on Table 2 <br /> The monitoring wells were sampled immediately after their development in January <br /> 2000 and again in May 2000 Depth to groundwater was measured before sampling <br /> using a Solinst water level meter Approximately 5 casing volumes were purged from <br /> ' the wells before sampling during the first round and 3 casing volumes from the second <br /> round Throughout purging and lust before sampling the wells, pH, specific <br /> conductivity, and temperature of the evacuated groundwater were measured and <br /> S\BFS\STOCKTON\LTR\LTR004 DOC 7/7100 <br />