Laserfiche WebLink
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility Page iii of'vii <br /> TABLE OF CONTENTS (CONTINUATION) <br /> SECTION PAGE <br /> 2.0 GENERAL PLAN REQUIREMENTS FOR ALL FACILITIES AND <br /> TYPES OF OIL [40 CFR§112.7]_-CONTINUATION, <br /> 2.7 Containment/Diversionary Structures and Equipment [40 CFR§112.7(c)]............ 6 <br /> 2.8 Secondary Containment Non-Practicability [40 CFR§I 12.7(d)] ________________27 <br /> 2.9 Inspections, Testing and Records [40 CFR§I12.7(e)]---------------------------------------------27 <br /> 2.9.1 Inspection and Testing Schedule_______________________________ ________________________27 <br /> 2.9.2 Daily Observations------------------------------------------------------------------------------------------ 28 <br /> 2.9.3 Monthly Inspections---------------------------------------------------------------------------------------- 28 <br /> 2.9.4 Annual Inspections------------------------------------------------------------------------------------------ 29 <br /> 2.9.5 Additional Inspections and Record Keeping---------------------------------------------------29 <br /> 2.10 Training and Discharge Prevention [40 CFR§I12.7(f)]_________________________________________ 29 <br /> 2.10.1 Training Requirements [40 CFR§112.7(f)(1)]---------------------------------------------30 <br /> 2.10.2 Designate Accountable Person [40 CFR§112.7(f)(2)]_______________________________ 30 <br /> 2.10.3 Spill Prevention Briefings [40 CFR§112.7(f)(3)]----------------------------------------31 <br /> 2.11 Security [40 CFR§112.7(g)]--------------------------------------------------------------------------------------3-1. <br /> 2.11.1 Site Fence 31 <br /> - - <br /> 2.11.2 Valve Security-----------------------------------------------------------------------------------------------32. <br /> 2.11.3 Lock Starter Controls 32 <br /> 2.11.4 Cap or Blank-Flange Connections----------------------------------------------------------------32 <br /> 2.11.5 Facility Lighting---------------------------------------------------------------------------------------------32 <br /> 2.12 Tanker Car and Truck Loading and Unloading Rack [40 CFR§I12.7(h)].............32. <br /> 2.13 Brittle Fracture Assessment [40 CFR§112.7(i)]-------------------------------------------------------33 <br /> 2.14 Conformance with State Requirements [40 CFR§112.70)]____________________________________33 <br /> 2.15 Oil-Filled Operational Equipment [40 CFR§112.7(k)]--------------------------------------------33 <br /> 3.0 PLAN REQUIREMENTS FOR PETROLEUM OIL-BASED FACILITIES <br /> [40 CFR§112.8 THROUGH 40 CFR§112.11] __________________________________________________________________ 34 <br /> 3.1 SPCC Plan Requirement [40 CFR§112.8(a)]------------------------------------------------------------34 <br /> 3.2 Facility Drainage [40 CFR§112.8(b)]-----------------------------------------------------------------------34. <br /> 3.2.1 Drainage from Diked Areas [40 CFR§112.8(b)(1)]------------------------------------- 4 <br /> 32.2 Allowable Drainage Valves [40 CFR§112.8(b)(2)]------------------------------------- 4 <br /> 3.2.3 Facility Drainage System Design [40 CFR§I 12.8(b)(3)]---------------------------- 4 <br /> 3.2.4 Drainage Diversion System [40 CFR§112.8(b)(4)]-------------------------------------34 <br /> 3.2.5 Drainage Water Treatment [40 CFR§I 12.8(b)(5)] -------------------------------------3-5. <br />