Laserfiche WebLink
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility Page iv of vii <br /> TABLE OF CONTENTS (CONTINUATION) <br /> SECTION PAGE <br /> 3.0 PLAN REQUIREMENTS FOR PETROLEUM OIL-BASED FACILITIES <br /> [40 CFR§112.8 THROUGH 40 CFR§112.11] - CONTINUATION <br /> 3.3 Bulk Storage Containers [40 CFR§112.8(c)]------------------------------------------------------------ 5 <br /> 3.3.1 Container Compatibility [40 CFR§112.8(c)(1)]------------------------------------------- 5 <br /> 3.3.2 Secondary Containment [40 CFR§112.8(c)(2)]-------------------------------------------36 <br /> 3.3.3 Drainage of Uncontaminated Rainwater [40 CFR§112.8(c)(3)]----------------- 6 <br /> 3.3.4 Cathodic Protection of Buried Tanks [40 CFR§112.8(c)(4)]----------------------36 <br /> 3.3.5 Cathodic Protection of Partially Buried Tanks [40 CFR§112.8(c)(5)]______36 <br /> 3.3.6 Tank Integrity Testing [40 CFR§112.8(c)(6)]---------------------------------------------- 7 <br /> 3.3.7 Control Leakage from Internal Heating Coils [40 CFR§112.8(c)(7)]________37 <br /> 3.3.8 Liquid Level and Leak Sensors [40 CFR§112.8(c)(8)]-------------------------------37, <br /> 3.3.9 Effluent Treatment Observations [40 CFR§112.8(c)(9)]-----------------------------38. <br /> 3.3.10 Correct Visual Leaks/Remove Accumulations [40 CFR§112.8(c)(10)]____38 <br /> 3.3.11 Mobile or Portable Containers [40 CFR§112.8(c)(11)]_____________________________ 39 <br /> 3.4 Facility Transfer, Pumping, and Facility Process (40 CFR§112.8)________________________39 <br /> 3.4.1 Buried Piping Cathodic Protection [40 CFR§112.8(d)(1)]________________________ 39 <br /> 3.4.2 Cap or Blank-Flange Connections [40 CFR§112.8(d)(2)]--------------------------39, <br /> 3.4.3 Pipe Support Design [40 CFR§112.8(d)(3)]________________________________________________39 <br /> 3.4.4 Inspection of Valves, Piping and Appurtenance [40 CFR§112.8(d)(4)]____39 <br /> 3.4.5 Vehicles Entering Facility [40 CFR§112.8(d)(5)]---------------------------------------39. <br /> 3.5 Requirements for Onshore Facilities [40 CFR§112.9, 40 CFR§112.10 and <br /> 40 CFR§112.11]------------------------------------------- ------------------------------------------- 39 <br /> 4.0 PLAN REQUIREMENTS FOR VEGETABLE OIL-BASED EQUIPMENT <br /> [40 CFR§112.12 THROUGH 40 CFR§112.15] __________________________________________________________________41_ <br /> 4.1 SPCC Plan Requirement [40 CFR§112.12(a)]---------------------------------------------------------41. <br /> 4.2 Facility Drainage [40 CFR§112.12(b)]---------------------------------------------------------------------41 <br /> 4.2.1 Drainage from Diked Areas [40 CFR§112.12(b)(1)]_________________________________ 41_ <br /> 42.2 Allowable Drainage Valves [40 CFR§112.12(b)(2)]_________________________________ 41_ <br /> 4.2.3 Facility Drainage System Design [40 CFR§112.12(b)(3)]_________________________42 <br /> 4.2.4 Drainage Diversion System [40 CFR§112.12(b)(4)]----------------------------------- 2 <br /> 4.2.5 Drainage Water Treatment [40 CFR§112.12(b)(5)] ___________________________________42 <br /> 4.3 Bulk Storage Containers [40 CFR§112.12(c)]_________________________________________________________42 <br />