Laserfiche WebLink
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility Page v of vii <br /> TABLE OF CONTENTS (CONTINUATION) <br /> SECTION PAGE <br /> 4.0 PLAN REQUIREMENTS FOR VEGETABLE OIL-BASED EQUIPMENT <br /> [40 CFR§112.12 THROUGH 40 CFR§112.151 - CONTINUATION <br /> 4.4 Facility Transfer, Pumping and Facility Process (40 CFR§112.8)-------------------------- 2 <br /> 4.4.1 Inspections, Testing and Records [40 CFR§112.12(d)(4)]-----------------------------42 <br /> 4.4.2 Vehicles Entering Facility [40 CFR§112.12(d)(5)]----------------------------------------43. <br /> 4.5 Requirements for Onshore Facilities [40 CFR§112.13, 40 CFR§112.14 and <br /> 40 CFR§112.15]-------------------------------------------------------------------------------------------------------- 43 <br /> 5.0 FACILITY RESPONSE PLAN REQUIREMENTS <br /> [40 CFR§112.20 AND 40 CFR§112.21)---------------------------------------------------------------------------- 44 <br /> 5.1 Facility Response Plan [40 CFR§112.20]-----------------------------------------------------------------44 <br /> 5.2 Facility Response Training [40 CFR§112.21]----------------------------------------------------------44 <br /> 6.0 REFERENCES 45 <br /> LIST OF TABLES <br /> Table 2-1 Types of Oil and Containers_____________________________________________________________________________________ 12 <br /> Table 2-2 Fuel Transfer Procedures for Tanker Trucks 14 <br /> ---------------------------------------------------------------- <br /> Table 2-3 Contact List and Phone Numbers 17 <br /> Table 2-4 Major Equipment Failure Discharge Prediction-------------------------------------------------------23 <br /> Table 2-5 Inspection and Testing Program________________________ ________ ________ ________ ________ ___________27, <br /> LIST OF APPENDICES <br /> Appendix A Facility Figures <br /> Appendix B Record SPCC Plan Review <br /> Appendix C Log of SPCC Amendments <br /> Appendix D Facility Photos <br /> Appendix E Spill Incident Report Form <br /> Appendix F Spill Response Materials Inventory <br /> Appendix G Facility Inspection Forms <br /> Appendix H Training Record Form <br /> Appendix I Criteria Flowchart for Substantial Harm and Facility Response Plan Certification <br /> Appendix J Spill Response Plan <br />