Laserfiche WebLink
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility Page 3 of 45 <br /> 1.4.2 Facilities Operational After February 18, 2005 [40 CFR§112.3(b)] <br /> Because the oil storage, handling, and use facilities at the Tesla Treatment Facility have been <br /> operational since July 2011, the facility is required to maintain and amend as-needed a SPCC <br /> Plan that meets the requirements of the SPCC Rule. <br /> 1.4.3 Mobile Facilities [40 CFR§112.3(c)] <br /> 40 CFR§112.3(c) of the SPCC Rule is not applicable to the Tesla Treatment Facility. <br /> 1.4.4 Professional Engineer's Certification [40 CFR§112.3(d)] <br /> I, Ellen Lee, a Licensed Professional Engineer(P.E.), having prepared this SPCC Plan do hereby <br /> certify and attest: that I am familiar with the requirements of the SPCC Rule; that I or my agent <br /> have visited and examined the facility; that the SPCC Plan has been prepared in accordance with <br /> good engineering practice, including consideration of applicable industry standards, and with the <br /> requirements of the SPCC Rule; that procedures for required inspections and testing have been <br /> established; and that the SPCC Plan is adequate for the facility. <br /> Signature <br /> QRpfESSI <br /> 'Ice <br /> �2 <br /> r� F <br /> `f1 Na, C20864 � <br /> m <br /> oe/sa/znis <br /> C I V V- �\P <br /> q� 4 <br /> Date: April 5, 2019 <br /> Professional Engineer: Ellen Lee <br /> Registration Number: C20864 <br /> State: California <br /> Firm: LEE Incorporated <br /> 28 Geary Street, Suite 525 <br /> San Francisco, California 94108 <br /> Phone: 415-421-2758 <br /> 1.4.5 Plan Availability for Inspection [40 CFR§112.3(e)] <br /> The Tesla Treatment Facility is subject to possible inspections by the Regional Administrator for <br /> the Environmental Protection Agency(EPA). The Regional Administrator for facility is SJCEHD. <br /> The SPCC Plan and supporting documents including completed forms,records of inspections and <br /> testing, and plan amendments are maintained in the Operations Building at the Tesla Treatment <br /> Facility. The Operations Building is open seven (7) days a week from 7:00 AM to 5:00 PM. <br />