My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2800 - Aboveground Petroleum Storage Program
>
PR0541548
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:28:07 PM
Creation date
7/11/2019 4:19:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541548
PE
2832
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention, Control and Countermeasure Plan 10* <br /> Tesla Treatment Facility Page 25 of 45 <br /> Table 2-4: Major Equipment Failure Discharge Prediction (Continuation) <br /> Maximum Volume Maximum Discharge Rate <br /> Potential Event Released(gallons) (gallons per minute) Direction of Flow <br /> Emergency Power Generation Facility(Continuation) <br /> Day tank overfills, 1 to 4,800 gal 20 gal/min Drip basin,otherwise <br /> power generator north of generator into <br /> storm drain inlet,and <br /> then south to retention <br /> pond. <br /> Leaking hose or fitting in 600 gal 330 gal/min North of generator into <br /> power generator storm drain inlet,and <br /> then south to retention <br /> pond. <br /> Leaking oil from engine 82 gal Gradual to instantaneous North of generator into <br /> crankcase in generator. storm drain inlet.and <br /> then south to retention <br /> pond. <br /> Substation Transformer,Electrical Building <br /> Failure of tank 723 gal Gradual to instantaneous Onto transformer pad <br /> and south to storm drain <br /> inlet,and then south to <br /> retention pond. <br /> Leaking tank 1 to 150 gal 10 gal/min Onto transformer pad <br /> and south to storm drain <br /> inlet,and then south to <br /> retention pond. <br /> Tank overfills <1 to 25 gal 20 gal/min Onto transformer pad <br /> and south to storm drain <br /> inlet,and then south to <br /> retention pond. <br /> Stormwater runoff and drainage in the area encompassing the facilities subject to the SPCC Rule <br /> is engineered to flow via storm drain inlets, culverts and swales, and underground piping to a <br /> retention pond located along the south side of the Tesla Treatment Facility. The retention basin <br /> captures stormwater runoff and drainage from throughout the Tesla Treatment Facility and <br /> provides for containment and sedimentation before flow continues eastward and offsite. From the <br /> retention basin, drainage flows via underground piping eastward and discharges offsite. From the <br /> property fence, drainage flows downhill in a northeasterly direction via drainage channels towards <br /> Interstate Highway I-580, located approximately 0.6 miles to the northeast of the facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.