Laserfiche WebLink
Spill Prevention, Control and Countermeasure Plan 10* <br /> Tesla Treatment Facility Page 25 of 45 <br /> Table 2-4: Major Equipment Failure Discharge Prediction (Continuation) <br /> Maximum Volume Maximum Discharge Rate <br /> Potential Event Released(gallons) (gallons per minute) Direction of Flow <br /> Emergency Power Generation Facility(Continuation) <br /> Day tank overfills, 1 to 4,800 gal 20 gal/min Drip basin,otherwise <br /> power generator north of generator into <br /> storm drain inlet,and <br /> then south to retention <br /> pond. <br /> Leaking hose or fitting in 600 gal 330 gal/min North of generator into <br /> power generator storm drain inlet,and <br /> then south to retention <br /> pond. <br /> Leaking oil from engine 82 gal Gradual to instantaneous North of generator into <br /> crankcase in generator. storm drain inlet.and <br /> then south to retention <br /> pond. <br /> Substation Transformer,Electrical Building <br /> Failure of tank 723 gal Gradual to instantaneous Onto transformer pad <br /> and south to storm drain <br /> inlet,and then south to <br /> retention pond. <br /> Leaking tank 1 to 150 gal 10 gal/min Onto transformer pad <br /> and south to storm drain <br /> inlet,and then south to <br /> retention pond. <br /> Tank overfills <1 to 25 gal 20 gal/min Onto transformer pad <br /> and south to storm drain <br /> inlet,and then south to <br /> retention pond. <br /> Stormwater runoff and drainage in the area encompassing the facilities subject to the SPCC Rule <br /> is engineered to flow via storm drain inlets, culverts and swales, and underground piping to a <br /> retention pond located along the south side of the Tesla Treatment Facility. The retention basin <br /> captures stormwater runoff and drainage from throughout the Tesla Treatment Facility and <br /> provides for containment and sedimentation before flow continues eastward and offsite. From the <br /> retention basin, drainage flows via underground piping eastward and discharges offsite. From the <br /> property fence, drainage flows downhill in a northeasterly direction via drainage channels towards <br /> Interstate Highway I-580, located approximately 0.6 miles to the northeast of the facility. <br />