My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WETMORE
>
210
>
2800 - Aboveground Petroleum Storage Program
>
PR0544025
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2019 4:20:12 PM
Creation date
7/11/2019 4:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544025
PE
2832
FACILITY_ID
FA0005481
FACILITY_NAME
MANTECA CORP YARD
STREET_NUMBER
210
Direction
E
STREET_NAME
WETMORE
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21938313
CURRENT_STATUS
01
SITE_LOCATION
210 E WETMORE ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 October 2019 AdvancedGeo <br /> AGE Project No. 99-0637 F n v i ro n m e n t a l <br /> Page 2 of 19 <br /> • If a spill or leak has occurred and review of the Plan by local enforcement agencies <br /> reveals the need to revise the Plan. Local enforcement agencies include the San <br /> Joaquin County Environmental Health Department (SJC-EHD), the United States <br /> Environmental Protection Agency Region 9 Regional Administrator (EPA-RA) and <br /> the California Environmental Protection Agency (CAL-EPA). A written spill report <br /> must be submitted to all local enforcement agencies within 60 days if the Facility <br /> discharges more than 1,000 gallons of oil into or upon the navigable waters of the <br /> U.S. or adjoining shorelines in a single spill event, or the Facility discharges oil in <br /> quantity greater than 42 gallons (barrel) in each of two spill events within any 12- <br /> month period. Additional information regarding emergency actions in detailed in <br /> Section 6.4 of this Plan. <br /> Plan amendments listed above are referred to as technical amendments and are required <br /> to be certified by a PE. Technical Plan amendments are documented on Table 1. <br /> If any "administrative changes", such as personnel changes or revisions to contact <br /> information, the Plan must be documented in the review log located in Table 1. <br /> Administration changes are made by Facility Management or the designated Coordinator <br /> and are not required to be certified by a PE. <br /> 2.1. SCHEDULED PLAN REVIEWS <br /> In accordance with 40 CFR 112.5, the Facility reviews this Plan at least once every <br /> 5 years. Revisions to the Plan, if needed, are made within six months of the five-year <br /> review. Scheduled reviews and Plan amendments are recorded in the Plan Review Log <br /> (Table 1), even if no amendments are made to the Plan. <br /> Last Plan Review: July 2012 <br /> Current Plan Review: October 2019 <br /> Next Plan Review: October 2024 <br /> 3.0. PLAN ADMINISTRATION AND FACILITY INFORMATION <br /> This section describes non-technical information for this Plan as approved by Facility <br /> management. <br /> 3.1. MANAGEMENT AND DESIGNATED PERSONNEL - 40 CFR 112.7 <br /> Facility management is committed to preventing discharges of oil to navigable waters and <br /> the environment, and to maintaining the highest standards for SPCC through the <br /> implementation and regular review and amendment to this Plan. Additionally, Facility <br />
The URL can be used to link to this page
Your browser does not support the video tag.