Laserfiche WebLink
25 October 2019 AdvancedGeo <br /> AGE Project No. 99-0637 F n v i ro n m e n t a l <br /> Page 3 of 19 <br /> management has fully approved and committed the necessary resources to implement <br /> the measures described in this Plan. <br /> Administrative Facility management certification is provided on the page located prior to <br /> the table of contents of this Plan. The administrative Facility management certification <br /> page also indicates Facility personnel accountable for SPCC at the Facility. <br /> 3.2. PROFESSIONAL ENGINEER CERTIFICATION - 40 CFR 112.3(d) <br /> The technical PE certification is provided on the page located prior to the table of contents <br /> of this Plan. The PE is familiar with the requirements of Part 112 of Title 40 of the Code <br /> of Federal Regulations [40 CFR part 112] and has visited and examined the Facility or <br /> has supervised examination of the Facility by appropriately qualified personnel. The <br /> certifying PE attests that this Plan has been prepared in accordance with good <br /> engineering practices, including consideration of applicable industry standards and the <br /> requirements of 40 CFR part 112; that procedures for required inspections and testing <br /> have been established; and that this Plan is adequate for the Facility [40 CFR 112.3(d)]. <br /> The PE certification in no way relieves the owner or operator of the Facility of his/her duty <br /> to prepare and fully implement this Plan in accordance with the requirements of 40 CFR <br /> part 112. This Plan is valid only to the extent that the Facility owner or operator maintains, <br /> tests, and inspects equipment, containment, and other devices as prescribed in this Plan. <br /> 3.3. PLAN AVAILABILITY - 40 CFR 112.3(e) <br /> A complete copy of this Plan is maintained at the Facility's main office. The main office <br /> hours include 4:30 AM to 3:30 PM, 5 days per week, with every other Friday closed. <br /> Personnel at the Main Facility (210 East Wetmore) includes a Solid Waste Supervisor <br /> and 35 full time personnel. Personnel at the Maintenance Shop includes the Maintenance <br /> Supervisor and 6 full time personnel. <br /> 3.4. CROSS-REFERENCE WITH SPCC PROVISIONS (40 CFR 112.7) <br /> This Plan does not follow the exact order presented in 40 CFR part 112. Section headings <br /> identify, where appropriate, the relevant section(s) of the SPCC rule. Table 2 presents a <br /> cross-reference of Plan sections relative to applicable parts of 40 CFR part 112. <br /> 3.5. FACILITY DESCRIPTION - 40 CFR 112.7(a)(3) <br /> Facility Name: City of Manteca Municipal Corporate Yard <br /> 120 and 210 East Wetmore Street <br /> Facility Address: Manteca, California 95337 <br />