Laserfiche WebLink
TABLE 7 <br /> Oil Transfer Procedures <br /> CITY OF MANTECA CORPORATION YARD <br /> 120 and 210 East Wetmore Street, Manteca, California <br /> Prior to loading/ . Inform facility personnel and gain consent for delivery, unless prearranged. <br /> unloading • All fuel delivery personnel must measure and verify that sufficient volume <br /> (ullage in gallons) is available in the storage tank. 95% of Maximum AST <br /> volume must be measured less than maximum fill line. <br /> • Electronic-Overfill senor operation must be monitored continuously and <br /> verified with Tank tape gauges are reading and accurately measuring Tank <br /> volume. TERMINATE fueling when Electronic-Overfill senor demonstrate <br /> filling at 95% of total. <br /> • Record tank volumes on a checklist prior to work. Calculate the percentage <br /> of the AST available and document,verify with delivery vendors the proposed <br /> volume for delivery. Inspect the Level Display on the loading end of the AST <br /> and review the readings. Ensure the volume for loading is within the ullage. <br /> • Inform facility personnel of ANY overage and WAIT. <br /> • However, this is filled by employees and can be visual inspected from the <br /> surface/top during filling and might be filled to the limit of the AST. <br /> • Most AST are filled by tanker employees, with Facility employee's <br /> inspection. <br /> • Visually check all hoses for leaks and wet spots. <br /> • Lock in the closed position all drainage valves of the secondary <br /> containment structure. <br /> • Secure the tank vehicle with wheel chocks and interlocks. <br /> • Ensure that the vehicle's parking brakes are set. <br /> • Verify proper alignment of valves and proper functioning of the pumping <br /> system. Make sure all values are in the proper positions. <br /> Establish adequate bonding/grounding prior to connecting to the fuel <br /> transfer point. <br /> • Use bucket when removing all plugs and caps. <br /> • Place drip pans under receiving headers. <br /> Hook up vapor hose when loading and unloading. <br /> During loading/ 0 When making a connection, shut off the vehicle engine. <br /> unloading Driver must stay with the vehicle at all times during unloading activities. <br /> • Periodically inspect all systems, hoses and connections. <br /> • When loading, keep internal and external valves on the receiving tank open <br /> along with the pressure relief valves. When transferring Class 3 materials, <br /> shut off the vehicle engine unless it is used to operate a pump. <br /> • Monitor flow meters to determine rate of flow. <br /> • When topping off the tank (95% Maximum), reduce flow rate to prevent <br /> overflow. <br /> After loading/ 0 Make sure the transfer operation is completed. <br /> unloading Close all tank and loading valves before disconnecting. <br />