My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
2900 - Site Mitigation Program
>
PR0505525
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 10:04:27 PM
Creation date
7/11/2019 4:50:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Installation Work Plan <br /> April 1997 <br /> STOCKTON PLATING <br /> 632 South El Dorado Street, Stockton, California <br /> 1.0. INTRODUCTION AND SCOPE OF WORK <br /> In accordance with a request from Stockton Plating,Advanced GeoEnvironmental, Inc., (AGE) has <br /> prepared this the enclosed Monitoring Well Installation Work Plan for the site located at 632 South <br /> El Dorado Street, Stockton, California. The scope of work includes installation of one additional <br /> ground water monitoring well at the site. <br /> The scope of work is to assess the lateral and vertical extent of hydrocarbon-impacted soil and <br /> ground water near the former underground storage tank (UST) areas. The location of the site is <br /> illustrated in Figure 1 - Location iVap. A plan of the site is depicted in Figure 2 -Site Plan. <br /> This work plan is prepared in accordance with San Joaquin County Public Health Services - <br /> Environmental Health Division(PHS-EHD) and the Central Valley Regional Water Quality Co:trol <br /> Board guidelines for the investigation of UST sites <br /> Background information, including details of previous site assessment work, was presented in <br /> previous quarterly reports and in the Corrective Action Plan - December 1995, prepared by AGE. <br /> 2.0. SCOPE OF WORK <br /> 2.1. DRILLING AND SAMPLING <br /> The scope of work will include the advancement of borings to a total depth of approximately 45 <br /> feet below surface grade (bsg), collection of soil samples, and the installation of a 2-inch diameter <br /> ground water monitoring well. Soil borings will be advanced utilizing a truck-niounted, drill rig <br /> equipped with 8.25-inch hollow-stens augers. <br /> Soil samples will be collected at five-foot intervals begiiuiing at a depth of 5 feet bsg, preserved and <br /> placed in a chilled container for transportation to a State-certified laboratory. Soils will be described <br /> using the Unified Soil Classification System (USCS). Soil sample descriptions and PID screening <br /> results will be summarized on boring logs prepared for the final report. <br /> 2.2. EQUIPMENT DECONTAMINATION <br /> All sampling tools and brass sleeves used for sample collection will be thoroughly rinsed 'NN ith clean <br /> eater after washing with a solution of Alconox. All hollow stem augers will be steam-cleaned prior <br />
The URL can be used to link to this page
Your browser does not support the video tag.