My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
INSTALL 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2019 5:01:10 PM
Creation date
7/12/2019 2:50:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaIS'ornia Petroleum <br /> Equipment, Inc. <br /> Item#4 Attached is a completed page# 3 for the Installation permit application. (see <br /> attachment 0-5) <br /> Item#5 Attached are the OPW manufacturers product information sheets.We will be <br /> installing the OPW# 1-4580 5 gal.overfill bucket on all fill locations. The tank installation <br /> detail sheet#T-1Ga reflects the new fill containment details. (see attachment#-4 and#-6 <br /> Item#6 Ultramar does not consider the tanks as subject to floatation as reported in <br /> the installation permit application pg. 7 the reported ground water table is at 75 feet. <br /> Ultramar does however require additional bury depth and concrete thickness as referenced to <br /> on drawing#T-1G detail A. <br /> Item#7 All product piping and secondary containment will be directed to the tank <br /> piping sumps at a min. of 1/8" per ft.All dispenser piping sump sensors will be wired to shut <br /> down that products turbine pump system upon detection of any fluid in the sump. The <br /> monitoring system will be wired so as to shut down all turbine pump assembles if the power is <br /> removed from the system to eliminate tampering by personal.We will demonstrate shut down <br /> upon final inspection. <br /> Item#8 There will be a red jacket mechanical leak detector installed to provide for <br /> initial leak detection with a system leak detection shut down as described in item#7. <br /> We will be referring to the existing soils management plan that was submitted <br /> to the County Health Dept. previously.Attached is a copy of this soils management plan for <br /> your records. (see attachment#-7) <br /> We are trying to start this project on 01-10-93 and must have both permits <br /> from you to proceed with the Lodi Building Dept. and Fire Dept.anything that you can do to <br /> expedite these permits would be appreciated. If there are any questions that have not been <br /> addressed please contact me at 209-276-1881 or page me at 209-487-6865,this is a digital <br /> pager please enter your area code first followed by your phone number. <br /> Sincerely, <br /> BrycI�V <br /> hh <br /> President <br /> P.O. BOX 9364 • Fresno, California 93792 - 209/276-1881 • Contractors License No. 432613 <br /> FAX#209/276-1894 <br />
The URL can be used to link to this page
Your browser does not support the video tag.