Laserfiche WebLink
05 April 1996 <br />IAGE-NC Project No 95-0142 <br />' Page 5 of 5 <br />Petroleum hydrocarbons were not detected in the purged water samples, therefore, we recommend <br />disposal of the water into the City of Stockton sanitary sewer Modification of the current discharge <br />permit may be required to discharge the purged water to the sewer <br />5 2 REMEDIATION OF HYDROCARBON -IMPACTED SOIL AND GROUND WATER <br />A Corrective Action Plan (CAP) for remediation of hydrocarbon -impacted soil and ground water was <br />' completed and submitted to the PHS-EHD in December 1995 Approval of the CAP was granted by <br />the PHS-EHD in March 1996 Installation of the proposed SVE/IAS system should commence as <br />soon as possible to prevent potential migration of the dissolved hydrocarbon plume <br />6.4. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by ` <br />environmental consultants practicing in this or similar localities The findings were based upon <br />analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br />conditions at the site for the purpose of this investigation are made from a limited number of data <br />points (i a monitoring wells, ground water samples) and subsurface conditions may vary away from <br />' these data points No other warranty, expressed or implied, is made as to the professional <br />recommendations contained in this report <br />1 <br />V Y E <br />l <br />f ' <br />