Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
s <br /> approval. <br /> ♦ <br /> Preparation of drilling permit A drilling permit and associated fee will be <br /> submitted to the PHS/EHD <br /> ♦ Regulatory liaison. <br /> The cost for TASK 1 should not exceed $590.00 Permits for off-site drilling are not <br /> included <br /> TASK 2 - CPT Penetrations <br /> ♦ Advancement of three CPT penetrations to depths of 50 feet <br /> ♦ Collection of soil samples at five-foot intervals, beginning, at 10 feet below ground <br /> surface (bgs) The CPT penetrations and soil sampling will be supervised and <br /> directed by a geologist, <br /> ♦ Transmission of soil samples to a state-certified laboratory <br /> The cost for TASK 2 should not exceed $4,163.00 <br /> TASK 3 - Soil Vapor Survey & Soil Boring Drilling <br /> A soil vapor survey of the site will be pei formed Nine ,apor points will be used We <br /> recommend collecting soil vapor samples at 10-foot inter\als Each sample will be field <br /> screened using a photo-ionization detector (PID) Based upon the results of the soil vapor <br /> survey, four soil borings will be drilled and sampled to depths of 50 feet <br /> 1 Advancement of nine (9) soil vapor veitical profiling penetrations to deptlis of 50 <br /> feet <br /> ♦ Collection of soil vapor samples at 10-foot intervals <br /> ♦ Field screening of soil vapor samples using a PID <br /> ♦ Based upon the results of the field screening, a work plan addendum will prepared <br /> indicating the location of the pioposed soil borings The woik plan addendum will <br /> be submitted to the PHS/EHD for approval <br /> ♦ DriIling of four (4) soil borings to deptlis of 50 feet The soil borings will be drilled <br /> using a truck-mounted, hollow stem drill rig Soil samples will be collected at five- <br /> foot intervals <br /> G-baal Add S.rv.an I— <br /> SP VS M 579 4',STOCkMN PLATING/, <br />