My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007796
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007796
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 4:53:57 PM
Creation date
7/15/2019 4:22:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007796
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. HEALTH AND SAFETY PROCEDURES <br /> CONDOR EARTH TECHNOLOGIES <br />' STANDARD OPERATING PROCEDURE <br /> CONCERNING HEALTH AND SAFETY <br />' Condor Earth Technologies, Inc. has adopted the following health and <br /> safety procedures for working with organic vapors and liquid contaminants <br />' encountered during investigative drilling and sampling operations. The purpose <br /> of this program is to provide health and safety precautions for the initial and <br /> subsequent site visits until the nature and magnitude of the contaminants have <br />' been defined. <br /> All work will be done in accordance with current OSHA regulations and all <br />' personnel working within the exclusion zone will have completed a 40-hour OSHA <br /> training course. A tailgate safety meeting will be held prior to commencement of <br /> work each day and a site-specific Health and Safety Plan will be discussed with <br /> and presented to all crew members for their signatures. <br /> A. Access to the project site shall be limited by the site perimeter (minimum <br /> of 20 feet). In no case shall the exclusion zone for all non-authorized <br /> personnel be less than 20 feet from the borehole location. No smoking will <br /> be allowed in the exclusion zone. <br /> B. The site manager shall coordinate all activities of equipment and personnel <br /> at the project site. Site manager responsibilities will include the following: <br /> I. Limiting access within the site perimeter to authorized personnel. <br /> 2. Providing written log of on-site activities and events. <br /> 3. On-site containment of potentially contaminated drill cuttings and <br /> water. <br /> 4. Monitoring ambient air vapor concentrations on the site perimeter. <br /> t5. Notification of regulatory agencies during emergency procedures as <br /> defined in step C below. <br /> 6. Enforcement of site safety precautions. <br /> Page -1 of 4- <br /> h <br />
The URL can be used to link to this page
Your browser does not support the video tag.