My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007809
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:15:55 PM
Creation date
7/15/2019 4:28:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007809
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/2412002 15 42 2094671118 AGE STOCKTON PAGE 04 <br /> • 31 January 2002 <br /> AGE-NC Project No 95-0128 <br /> Page 3 of 8 <br /> bottom of the boring to a point approxmiately two feet above the top of the screen Following filter <br /> pack placement, a sui ge block was inserted into the well casing and was alternately raised and <br /> lowered(surged)repeatedly for appx oxmately 20 mmnutes to settle the filtex pack material. A nominal <br /> two-foot seal of bentonite pellets was placed above the filter pack and allowed to hydrate with clean <br /> tap water The remaining annular space was backfilled with portland cement An as-built well- <br /> construction diagram is included as Appendix A <br /> 2 3 WELL DEVELOPMENT <br /> On 13 July 2001,wells EW-1 and EW-2 wei a developed utilizing a stainless steel hand bailer,4-inch <br /> dxametei PVC hand bailei Approximately 60 gallons of ground water were purged from wells until <br /> the ground watei produced was visually sediment free Purged ground water was collected from the <br /> wells to a propei ly labeled DOT-apps oved model 17H 55-gallon drum and was stored at the site The <br /> field log for well development activities is included in Appendix B <br /> 2 4 SOIL SAMPLE ANALYSIS <br /> Three soil sample from the site was submitted foi geotechnical analysis The samples were <br /> tiansported to Copper Testing Laboratory(CTL) of Mountain View, California and were analyzed <br /> for porosity and permeability in accordance with ASTM Method D5084 <br /> 3.0. GROUND WATER EXTRACTION TEST <br /> On 18 October 2001,a twelve-hour aquifer pump test was pex formed at the site to assess the general <br /> aquifer chaiactenstics and to assess aquifer response to ground water extraction at a constant <br /> pumping i ate utilizing well FW-l for gi ourxd water extraction and wells EW-2, MW-3, MW-4, <br /> MW-5,and MW-6 and vapor well VW-I to VW-4 as observation wells Two extracted ground water <br /> samples were collected and purged gi ound watei was containerized in an on-site 6,500--gallon poly <br /> tank(Baker tank) <br /> 3 1 AQUIFER TEST, 18 OCTOBER 2001 <br /> The ground water extraction test consisted of extracting ground water from well EW-1 at a rate of <br /> 5 gallons per mnute (GPM) Ground water was extracted from the upper water table, the depth to <br /> ground watei was within the screened inter val of the extraction well <br /> Advancdd GeoEnvlronmental Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.