My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007814
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:54:12 PM
Creation date
7/15/2019 4:31:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007814
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I and short bands if both lengths are provided)with the studs and angle ends sticking out away from the <br /> tank Fasten the bands together with the 3/811- 16 x 40 hex head bolts as shown in the drawing <br /> Raise the bands 17'and loosely Install the anchor clips using the 1/211- 13 hex nuts and 112" washers <br /> provided Tighten the 318"- 16 x 4" hex head bolts to remove band looseness Mark the slot <br /> locations of the anchor clips, remove the clips, and install the required number of 1/2"anchor bolts <br /> Anchor bolts are not provided by the manufacturer and must be purchased by the customer <br /> 3/8' FLAT MASMU <br /> 3ie LACK WASHER -16 X 4' E(JOA-N-C <br /> B'-i6 HEX NUT1/2' EX N MASHEi!AND HFJf NlliANOM CLIP <br /> 1/Y ANO�t BELT FIAT <br /> ..M LLOt YA98 AW 1r2' ANDUR B1bT ASST <br /> HEX aff[WSTp 37PPL]®� (1 RMI R�PER ANDUR CLIP <br /> CLIPI) <br /> CUSTEMFR SUPPLIER <br /> ANK 121A '-1 4' B0. <br /> (TN NU S <br /> IN 4B IN CLIPS HEX MASH9iST ANn ApTT WASHE S <br /> 4 B 4 <br /> 4 1A 7 <br /> 16 <br /> 5 <br /> 9 IB <br /> Figure 5 1 <br /> 513 Replace the anchor clips and secure the clips to both bands and the concrete pad Do not over <br /> tighten the bands to the tank The band tension should only remove looseness and not cause any <br /> tank deflection <br /> 52 WIND/SEISMIC TANK RESTRAINT SYSTEM(FLAT BOTTOM TANKS) <br /> 5 2 1 The wind/seismic tank restraint system Is designed for tank restraint on an appropriate concrete <br /> pad under 110 MPH wind or seismic zone 4 conditions Using the assembly drawing and table <br /> shown in Figure 5 2, verify that all parts are present <br /> 522 Locate the tank on the concrete pad as desired Layout all anchors required (4 or 8)equally <br /> spaced, (4 anchors must be directly below the tank tie down locations) Make sure all anchors <br /> are located next to the tank with the 2 ea eye bait holes of the anchor on top of the weldment and <br /> the plate face of the anchor weldment located next to the tank. Mark all the anchor bolt locations, <br /> remove the anchors and install the required Hilb adhesive model HVA anchor bolts as specified by <br /> the assembly drawing and the SII seismic restraint drawings B-2686A through B-2688A These <br /> anchor bolts are not provided by the manufacturer and must be purchased by the customer. <br /> 623 Replace the anchors and secure the anchors to the concrete Install the 314"eyebolts loosely as <br /> shown by the drawing Fasten the tank to the concrete pad with the required cable (make sure <br /> the cable sheath is on the cable and located around the lug locations)as shown by the assembly <br /> drawing utilizing the cable thimbles and clamps provided Tension the cable before filling the tank <br /> to remove cable looseness Do not over-tension the cables as this may cause tank damage The <br /> cable tension will change with tank loading and temperature changes•DO NOT re-tension the <br /> cables <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.