Laserfiche WebLink
HMP <br /> TANK <br /> A O <br /> J-BMT <br /> BEVEL YA9� <br /> LICK WASWR <br /> A F EK NUT <br /> HOOP SK 10 <br /> 750 X 45 REQUIRES 3 EA <br /> 1000 X 46 REQUIRES 4 EA <br /> J--BOLT 1585 X 50 REQUIRES 4 EA <br /> SKID TANK <br /> BEVEL WASHER <br /> LOCK WASHER SKID <br /> HEX NUT <br /> VIEW A-A (ONE SIDE ONLY)l <br /> Figure 5 8 <br /> sitting on level ground) Use the assembly drawing shown in Figure 5 8 to assist in part identification <br /> and assembly <br /> 582 Position the skid provided in the desired location and attach as necessary for the application <br /> Position the tank on the skid with the legs centered over the hoop mounting holes in the top of the <br /> skid <br /> 583 With one person on each side of the tank, insert J-bolts into the hoop holes and lift the hoop into <br /> position directly above the tank legs Spread the hoop slightly while sliding the hoop (centered in <br /> the pipe guide channel formed into the tank legs) onto the tank Insert the J-bolts into the proper <br /> holes in the top of the skid Install the bevel washer, lock washer, and hex nut on each of the <br /> J-bolts loosely Do not tighten the hex nuts yet See viewA-A shown in Figure 5 a for an <br /> illustration of the loosely assembled J-bolt/hoop assembly <br /> 584 Repeat the procedure as detailed in section 5 8 3 for each of the remaining hoops required When <br /> all hoops have been loosely installed, check the tank and hoop alignment to make sure the placement <br /> is correct When proper allgnment has been established,start tightening the hex nuts on each hoop <br /> Tighten both sides of the hoop equally until the top of the hoop is tight all the way around the top of the <br /> tank and proper tension is obtained Proceed to the next hoop and repeat the tightening procedure <br /> until all of the hoops have proper tension Recheck the hoop tension after the tank has been filled <br /> Tighten the hoops as necessary until the top of the hoop is tight all the way around the top of the tank <br /> 5 9 EQUIPMENT PLATFORMS(64", 86",90",AND 142") <br /> 591 Equipment platforms are designed to provide structural support for tank fittings, piping, mixers, <br /> etc The platforms relocate the load caused by tank accessories to the tank wall for maximum <br /> tank support. Tanks with diameters of 86"or less have equipment platforms with a rated load <br /> capacity of 400 lbs Tanks with diameters of 90" or more have equipment platforms with a rated <br /> 26 <br />