Laserfiche WebLink
•i �l <br /> • <br /> SPACER BARS (2 PROVIDED) <br /> U-BOLT ASSEMBLIES (8 REQUIRED) <br /> EQUIPMENT PLATFORM SIDE MEMBER <br /> EQUIPMENT PLATFORM FOOT (2 REQUIRED) <br /> TANK TIE-DOWN U-BOLT (WITH LOCK WASHERS <br /> LUG AND HEX NUTS) <br /> ® EQUIPMENT PLATFORM END <br /> Q MEMBER (2 REQUIRED) <br /> BOLT, LOCK WASHED AND <br /> HEX NUT (16 REQUIRE❑) <br /> Figure 5 9 <br /> load Capacity of 600 lbs Refer to the assembly drawing shown In Figure 5.9 for assistance in part <br /> identification and assembly information <br /> 5 9 2 Position the equipment platform structural components as shown in the assembly drawing on the <br /> ground Using the fasteners provided, assemble the equipment platform and tighten the fasteners on <br /> the ground When all fasteners have been properly installed, positron the equipment platform on the <br /> tank with appropriate lifting equipment (when properly installed the platform feet should be locked <br /> behind the tank tie-down lugs) Using appropriate safety equipment, position the spacer bars <br /> appropriately to connect the tank equipment requiring support to the spacer bars and tighten U-bolts <br /> to secure the spacer bars in place Other support pieces may be necessary to connect the tank <br /> equipment to the spacer bars and will have to be provided by the customer for the specific application <br /> SI1 recommends use of the cable style"wind/seismic tank restaint system"when using this style of <br /> equipment platform to support motor driven equipment The cable will go through the platform feet <br /> restraining all equipment to the floor <br /> 510 EQUIPMENT PLATFORMS (102"AND 120") <br /> 5 101 Equipment platforms are designed to provide structural support for tank fittings, piping, mixers, <br /> etc The platforms relocate the load caused by tank accessories to the tank wall for maximum <br /> tank support These equipment platforms have a rated load capacity of 600 lbs Refer to the <br /> assembly drawing shown in Figure 5 10 for assistance in part identification and assembly <br /> information <br /> 5102 Position the equipment platform structural components as shown in the assembly drawing on the <br /> ground Using the set screws provided,assemble the equipment platform and lightly lock the <br /> tubes in place When all fasteners have been properly Installed, position the equipment platform <br /> on the tank with appropriate lifting equipment and secure one mounting leg to one of the tank's <br /> lifting lug sets with 1 ea attachment tube, 4 ea 1"flat washers, and 2 ea 3116"x 2" plated cotter <br /> pins Loosen the set screws and slide the other mounting legs into position Secure each of the <br /> mounting legs with attachment tubes, washers, and cotter pins as stated previously Center the <br /> 27 <br />