Laserfiche WebLink
General Pretreatment Industrial Users <br /> Permit Conditions <br /> approval <br /> b In the event of any change in control or ownership of the land or wastewater <br /> discharge facility presently owned or controlled by the discharger to whom the Permit <br /> was issued, the permittee shall notify the succeeding owner or operator by a letter <br /> sent certified mail of the requirement to obtain a new Wastewater Discharge Permit <br /> A copy of the letter must also be immediately forwarded to the City <br /> Any new or succeeding owner shall also comply with the terms and conditions of the <br /> existing permit until a new permit can be issued <br /> 24 Duration <br /> a Permits shall be issued for a specified time period, not to exceed 5 years A permit <br /> may be issued for a period less than 5 years or may be stated to expire on a specific <br /> date <br /> b If the permittee wishes to continue an activity regulated by this permit, the permittee <br /> must submit an application for a new permit at least 60 days before the expiration <br /> date of this permit <br /> c An expired permit will continue to be effective and enforceable as long as one of the <br /> following conditions apply <br /> 1 The permittee has submitted a completed permit application at least 60 days <br /> prior to the expiration date of the existing permit <br /> 2 The failure to reissue the permit, prior to the expiration of the previous <br /> permit, is not due to any act on the part of the permittee <br /> 25 Permittee shall, if necessary, provide, maintain, and operate a pretreatment system capable <br /> of meeting all applicable lin stations Pernuttee shall insure that all pretreatment equipment <br /> is in proper working condition at all times A pretreatment system maintenance schedule <br /> shall be submitted with each wastewater discharge application All maintenance records for <br /> pretreatment equipment shall be kept and available to the City The City may require that <br /> when necessary for the safe and proper operation of pretreatment equipment that the <br /> permittee shall provide all necessary training and education to permittee's pretreatment plant <br /> operators At a minimum, educational training shall include <br /> { <br /> -5- <br />