Laserfiche WebLink
I11 iq <br /> • General Pretreatment Industrial Users <br /> Permit Conditions <br /> 1 General principles of pretreatment equipment operation <br /> 2 Basic understanding of the mathematics relating to pretreatment equipment <br /> 3 Understanding of basic sampling on monitoring techniques <br /> 4 Basic knowledge of the regulations and limits governing the regulations for <br /> wastestream type being discharged <br /> 5 Proper safety procedures <br /> 5 Basic knowledge of hazardous waste labeling and storage <br /> Documentation of all training and education provided shall be kept and made available to the <br /> City <br /> 25 The terms and conditions of this permit may be subject to modification by the City of <br /> Stockton during the term of this permit as limitations or requirements are identified or other <br /> dust cause The permittee shall be informed of any proposed changes at least 30 days prior <br /> to the effective date of change Compliance with any changes or new conditions in this <br /> permit shall be concluded within 90 days following the effective date of change <br /> 27 If any provision if this permit or the application to any person or circumstances is held <br /> invalid, the remainder of this permit or the application of such provisions to other persons <br /> or other circumstances shall not be affected <br /> 28 The remedies provided for in this permit shall be cumulative and not exclusive, and shall be <br /> in addition to any and all other remedies available to the City <br /> -6- <br />