Laserfiche WebLink
CHRONOLOGY <br /> c See prior reports for priod from 03/31/92 to 10/28/92 <br /> 11/04/92 <br /> Collect influent and effluent samples of the system, and <br /> vapor samples from VSB3 , VSB5 , VSB9 , VSB11 and MW5 for <br /> analysis at WEGE laboratory Flow rate 87 cfm. <br /> Drain water 6 gallons of water from vapor lines <br /> 11/17/92 <br /> Collect influent and effluent samples of the system for <br /> analysis at WEGE laboratory Flow rate 87 cfm <br /> Drain water from vapor lines Add one 85 carbon canister. <br /> 12/01/92 <br /> Collect influent and effluent samples of the system for <br /> analysis at WEGE laboratory Flow rate 87 cfm <br /> Drain water from vapor lines <br /> 12/07/92 <br /> Collect influent and effluent samples of the system for <br /> analysis at WEGE laboratory. Flow rate 87 cfm. <br /> Drain water from vapor lines <br /> 12/09/92 <br /> Collect influent and effluent samples of the system, and vapor <br /> samples from VSB3 , VSB5, VSB9 , VSB11 and MW5 for analysis at <br /> WEGE laboratory Flow rate 72 cfm <br /> Drain water from vapor lines Change out carbon canisters <br /> page 2 of R604 , 12/17/92 <br />