Laserfiche WebLink
1 1.1 <br /> CHRONOLOGY <br /> 03/31/92 <br /> System started, 12 : 35 PM. Inspected by Teresa Stuyt, San <br /> Joaquin valley Unified Air Pollution Control District. <br /> Operating with vapor recovery wells P1, EX, P3-Swarm, and <br /> MW5 . Blower 1-DR505 into 2-110 gallon carbon scrubs. <br /> Initial flow at 57 cfm, blower over heated and it turned off, <br /> once restarted the pump bypass was opened and flow was <br /> maintained at 29 cfm. Sample the influent and effluent from <br /> the system and the vapor from the wells using a Photovac <br /> 10550 chromatograph. <br /> 04/03/92 <br /> Sample the influent and effluent from the system and the <br /> vapor from the wells using a Photovac 10550 chromatograph. <br /> Flow rate 29 cfm <br /> 04/7/92 <br /> Sample the influent and effluent from the system and the <br /> vapor from the wells using a Photovac lOS50 chromatograph. <br /> Flow rate 29 cfm. <br /> 04/10/92 <br /> Sample the influent and effluent from the system using a <br /> Gastech LEL/02 meter. Flow rate 28 cfm. <br /> 04/14/92 <br /> Sample the influent and effluent from the system and the vapor <br /> from the wells using a Photovac 14550 chromatograph. Flow <br /> rate 32 cfm. <br /> 04/17/92 <br /> Sample the effluent from the system, break through occurring <br /> from last carbon 2 : 30 PM, flow rate 31 cfm. Shut system <br /> down, change out carbon, wire in second blower (DR505 ) , <br /> placed in series, and restart system at 5 : OOPM, sample <br /> influent, effluent and the vapor from the wells using a <br /> Photovac 1OS50 chromatograph. Flow rate 80 cfm. <br /> R604 vapor, 9/09/92 , p. 2 <br />