i <br /> R604 :UPDATE 11-JULY, 1992 <br /> ! Southeast of Tank Excavation near SB2 - AREA <br /> n ; ! Soil boring SB3 revealed soil contamination at the 30 and 35 foot <br /> !ra ` depths of a highly degraded gasoline (no light range petroleum <br /> hydrocarbons with Benzene and Toluene being below detection <br /> ! J limits . <br /> ► Subsequent borings east and north of SB3 ( SB8 and SB10 <br /> r it respectively) were below detection limits , indicating a limited <br /> lateral extent. <br /> 11 Soil borings drilled west and southwest of SB3 also detected soil <br /> i contamination but with greater vertical extent (SB9 and SB11 ) . <br /> �! Soil, boring SB12 was slant drilled beneath the building at 30c" off <br /> of vertical . The sample results and field screening showed this <br /> boring to be clean, thus showing lateral extent south of the tank <br /> area and SB9 and SB11 . <br /> ; ! SB3 , SB5 , SB9 and SB11 were converted into vapor extraction wells <br /> on July 22 , 1992. <br /> s E <br /> VAPOR EXTRACTION <br /> VAPOR RECOVERY SYSTEM AND MONITORING <br /> As stated in the Update Status Report #6 , wells P1 , P3 , EX, MW1 <br /> . and MW5 are manifolded to a vapor extraction system with <br /> .individual valved orifices for flow control and measurement from <br /> the individual wells . Since the completion of the confirmation <br /> soil sample borings , P1 has been destroyed and four new vapor <br /> extraction wells (VSB3 , VSB5 , VSB9 and VSB11 ) have been added to <br /> the vapor extraction system. The individual wells are fitted with <br /> PVC "T" heads ( 4" reducing to 211 ) with locking air tight caps , <br /> for well access . The "T" laterals ( 211 ) are fitted with 1/4" pipe <br /> to tubing fittings for obtaining vacuum/pressure and temperature <br /> readings . Pipe to hose 21' unions are placed between the "T"s and <br /> the 2" PVC flex hoses that go from the well to the extraction <br /> manifold. At the manifold the individual wells are connected to <br /> their own 2" PVC riser ( 36" in heigth) with an orifice plate and a <br /> gate valve at the top of the riser . Vacuum/pressure ports are <br /> i located on either side of the orifice plate. Each orifice (well ) <br /> has its own manometer (calibrated in millimeters (mm) water ) which <br /> � is hooked to the ports for continuous measurement of flow from a <br /> `Old ! particular well . All the extraction wells are manifolded together <br /> , above the gate valve to a set of two orifice risers that are in <br /> parallel prior to the vacuum pumps . After the vapor stream leaves <br /> the manifold, it is then pulled into the pumps (two Rotron DR505 <br /> � i placed in series ) prior to entering the activated charcoal vapor <br /> scrubs . I£ breakthrough was found to be occurring through the 1st <br /> a carbon, this carbon was removed from the system; the #2 carbon was <br /> then placed into the #1 position and a new carbon placed on the <br /> E exhaust as the #2 carbon. <br /> 3I page 4 <br /> I <br />