John Margowski <br /> Page 2 <br /> day All of the vapor wells which are currently plumbed to the vapor extraction system were installed July <br /> 1992 as a result of contamination which was detected during confirmation soil sampling (see below) <br /> PHS/EHD recommends the continued operation of the vapor extraction system with consideration given to <br /> pulsing the system to allow equilibration of soil vapor concentrations <br /> Well screen sand pack soil contamination vapor sample <br /> July 1992 April 1993 <br /> VSB3 35-45' 25-45' 30-35' 1,500 ppm TPH 014 ppm TPH <br /> VSB5 27-37' 20-37' 20-30' 100 ppm TPH 107 ppm TPH <br /> VSB9 45-55' 15-55' 15-55' 11,000 ppm WH 0 90 ppm TPH <br /> VSBI1 30-40' 12-40' 15-30' 1,800 ppm TPH 3 44 ppm TPH <br /> Confirmation Sampling <br /> The work plan proposed drilling one soil boring, SB13, to show that soil remediation has been completed <br /> If contamination is encountered, the soil boring would be converted into a vapor extraction well The work <br /> plan also proposed the destruction of vapor extraction wells P3, P3A, P313, P3C, P313, EX, VSB3, VSB5, <br /> VSB9, VSBI1 <br /> Residual contamination detected after the 1990 re-excavation attempt has been under remediation since the <br /> vapor extraction system began operation in 1991 The work plan suggested that by March 1993 the majority <br /> of all recoverable hydrocarbon vapors would have been removed PHS/EHD does not agree that all <br /> recoverable hydrocarbon vapors have been removed, based on more recent data PHS/EHD recommends, at <br /> minimum, that vapor extraction continue for an additional quarter, prior to confirmation sampling <br /> Three areas of residual contamination have been designated, Area A, Area B, and Area C. Area A <br /> encompasses the western pump island (pump island #1),Area B encompasses the eastern tank field,and Area <br /> C encompasses the eastern pump island (pump island#3) The proposed soil boring,S1313,would be located <br /> in Area B <br /> Area A <br /> Confirmation soil sampling in July 1992 indicated that contamination was still present as evidenced <br /> by soil boring, VS135 The extent of residual contamination was better defined in July 1992, since no <br /> contamination was detected in soil borings, SBS and S137 No confirmation soil sampling was <br /> proposed in this area PHS/EHD requests a minimum of one confirmation soil borings in Area A. <br /> Area B <br /> Confirmation soil sampling in July 1992 indicated that contamination was still present as evidenced <br /> by soil boring, VSB3, VSB9, and VSB11 The extent of residual contamination was better defined in <br /> July 1992, since no contamination was detected in soil borings SB10, S138 and S1312. The area of <br /> residual contamination extends approximately 40 feet by 20 feet The proposed soil sample, S1313, <br /> is inadequate to characterize this area PHS/EHD requests a minimum of two confirmation soil <br /> borings in Area B <br />