Laserfiche WebLink
TABLE 1 ADD CARBON CARBON <br /> VAPOR RECOVERY SUMMARY CARBON CHANGE CHANGE <br /> FORMER REGAL STATION 604 UNIT OUT OUT <br /> (AUTHORITY TO CONSTRUCT) TWO PUMPSTWO PUMPSTWO PUMPSTWO PUMPSTWO PUMPS <br /> PERMIT # AP 91-106 <br /> HOURS OPERATED 5166.75 5484.5 6010.5 6844.5 7831.25 <br /> TIME 8.25 14 14 10 14.75 <br /> TFH STANDARD AREA <br /> BENZENE STANDARD AREA <br /> DATE 11/04/92 11/17/92 12/09/92 01/13/93 02/23/93 <br /> TOTAL INFLUENT <br /> TFH MG/L 1.55 1..28 1.48 1.64 1.31 <br /> BENZENE MG/L 0.04 0.00 0.02 0.00 0.00 <br /> DIFFERENCE ACROSS ORIFICE 240.00 240.00 200.00 230.00 280.00 <br /> IN MILLIMETERS (MM) WATER 240.00 240.00 200.00 230.00 280.00 <br /> FLOW RATE CFM 87.22 87.22 79.62 85.39 94.21 <br /> TFH POUND PER DAY 12.65 10.45 11.03 13.11 11.55 <br /> BENZENE LBS/DAY 0.31 0.00 0.13 0.00 0.00 <br /> TOTAL LBS TFH RECOVERED 15450.77 15603.72 15839.11 16258.49 16765.41 <br /> TOTAL GALLONS REMOVED 2472.12 2496.60 2534.26 2601.36 2682.47 <br /> TOTAL LBS BEN RECOVERED 336.21 338.26 339.65 341.85 341.85 <br /> EFFLUENT CARBON 1 <br /> TFH MG/L 2.47 1.29 0.08 1.66 <br /> BENZENE MG/L 0 0 0 0 <br /> FLOW RATE CFM 87.22 79.62 85.39 94.21 <br /> TFH POUND PER DAY 20.16 9.61 0.64 14.64 <br /> BENZENE LBS/DAY 0.00 0.00 0.00 0.00 <br /> EFFLUENT LAST CARBON <br /> TFH MG/L 0.06 0.00 0.01 0.00 0.08 <br /> BENZENE MG/L 0.001 0.000 0.000 0.004 0.000 <br /> FLOW RATE CFM 87.22 87.22 79.62 85.39 94.21 <br /> TFH POUND PER DAY 0.49 0.00 0.07 0.00 0.71 <br /> BENZENE LBS/DAY 0.01 0.00 0.00 0.00 0.00 <br /> MW1 VSB9 VSB9 VSB9 VSB9 VSB9 <br /> TFH MG/L 1.74 0.78 1.5 1.62 <br /> BENZENE MG/L 0.04 0.009 0.000 0.000 <br /> DIF. ACROSS ORIF, MM W 40.00 30.00 40.00 18.00 <br /> FLOW RATE CFM 17.80 15.42 17.80 11.94 <br /> TFH POUND PER DAY 2.90 1.13 2.50 1.81 <br /> BENZENE LBS/DAY 0.06 0.01 0.00 0.00 <br /> LBS TFH RECOVERED 818.33 689.09 952.08 1040.70 <br /> LBS BEN RECOVERED 4.43 5.77 5.99 5.99 <br /> MW5 MW5 MW5 MW5 MW5 MW5 <br /> TFH MG/L 1.18 0.75 0.83 0.97 <br /> BENZENE MG/L 0.03 0.009 0.000 0.000 <br /> DIF. ACROSS ORIF, MM W 370.00 400.00 360.00 230.00 <br /> FLOW RATE CFM 49.98 51.97 49.30 39.41 <br /> TFH POUND PER DAY 5.52 3.65 3.83 3 .58 <br /> BENZENE LBS/DAY 0.15 0.04 0.00 0.00 <br /> LBS TFH RECOVERED 9622.46 9783.63 9913.58 10065.87 <br /> LBS BEN RECOVERED 1609.16 1612.56 1613.32 1613.32 <br />