Laserfiche WebLink
S E C 0 R <br /> . Mr. Mike Infurna <br /> November 21, 2005 <br /> Page 4 <br /> If there are any questions regarding the contents of this work plan, please call us at (916) <br /> 861-0400. <br /> Sincerely, <br /> SECOR I ternational Incorporated <br /> " <br /> Lid <br /> 7 aK <br /> Thomasotter pFESS/ <br /> Project Scientist PRE CNq�� <br /> ti y <br /> �J 2 <br /> J C58 99 rn r <br /> (u's t Y enkosky, E. EXP.12/3112006 <br /> Principal Engineer <br /> L9 clvl�- <br /> �rFOFCAL►FQ� � <br /> Attachments: Figure 1 —Site Plan with Proposed Groundwater Monitoring Well41 ?` <br /> Locations , <br /> Table 1 — Soil Boring and Well Completions " . <br /> Attachment A— Field and Laboratory Procedures <br /> xr. <br /> cc: Shelby Lathrop, ConocoPhillips 1.1 <br /> k <br /> �N 4 <br /> �`'d <br /> Yi <br /> • 3 <br /> ConocoPhillips144091work plans/WP For Well Installation 11-05.doc <br />