Laserfiche WebLink
I <br /> • S E C 0 R <br /> Mr Mike Infurna <br /> August 12, 2004 <br /> Page 3 <br /> If there are any questions regarding the contents of this work plan, please call us at (916) 861-0400 <br /> Sincerely, <br /> SEC4// K� <br /> OR International Incorporated <br /> Qp,OFESS/p <br /> a eClinton a <br /> rms <br /> AssocScientist <br /> N0 �fz C0�583�99EV � <br /> Rusty Benkosky, P <br /> Senior Engineer `req CM <br /> 9 L �P <br /> SOF C AL14apN <br /> Attachments Figure 1 —Site Plan with Proposed Groundwater Monitoring Well <br /> Locations <br /> . Table 1 —Soil Boring and Well Completions <br /> Attachment A—SJCEHD Letter dated March 25, 2004 ; <br /> Attachment B— Field and Laboratory Procedures <br /> cc Shelby Lathrop, ConocoPhillips <br /> y5 <br /> ,r <br /> ConocoPhdhps14409/work plansAAfP For Well Installation 8-04 doc <br />