Laserfiche WebLink
a <br /> Tosco Corporation,A Subsidiary of Phillips Petroleum Company lune 21 2002 <br /> Tosco Service Station No 4409 1502 El Dorado Street Stoekton CA <br /> On August 30, 31, and September 5, 2001, IT Installed three additional on-site deep <br /> groundwater monitoring wells (MW-8 through MW-10) at locations upgradient of the <br /> UST complex, in the vicinity of the pump Islands and downgradient of the pump <br /> Islands Wells were completed at depths of 79 feet (MW-8) and 80 feet bgs (MW-9 and <br /> MW-10) Petroleum hydrocarbons were present in soil samples collected between 60 <br /> and 80 feet bgs, with concentrations of TPHg and benzene reported up to 4,400 mg/kg <br /> and 77 mg/kg, respectively TPHg was detected in wells MW-8 through MW-10 at <br /> concentrations up to 22,000 ug/l, and benzene was detected in wells MW-9 and MW-10 <br /> at concentrations up to 600 ug/l Fuel oxygenates were not detected in any soil and <br /> groundwater samples collected from the site Based on the results of this investigation, <br /> SECOR recommended the Installation of additional off-site deep zone groundwater <br /> monitoring wells for further delineation of the dissolved petroleum hydrocarbon plume <br /> between approximately 60 feet and 80 feet bgs (SECOR, May 29, 2002) <br /> PROPOSED SCOPE OF WORK <br /> Four off-site wells are proposed to delineate the downgradlent extent of the dissolved <br /> petroleum hydrocarbon plume in the deeper water-bearing zone The proposed <br /> locations are shown on Figure 2 The specific scope of work Is discussed below <br /> • Site Safety Plan. As required by the Occupational Health and Safety <br /> Administration (OSHA) Standard "Hazardous Waste Operations and <br /> Emergency Response" guidelines (29 CFR 1910 120), and by <br /> California Occupational Health and Safety Administration <br /> (Cal-OSHA) "Hazardous Waste Operations and Emergency <br /> Response" guidelines (CCR Title 8, Section 5192), SECOR will <br /> prepare a site-specific Health and Safety Plan (HASP) prior to the <br /> commencement of fieldwork The site-specific HASP will be <br /> reviewed by the field staff and contractors prior to the <br /> commencement of field operations at the site, and is included as <br /> Attachment A <br /> • Permitting Encroachment permits will be obtained for three of the <br /> four proposed well locations An access agreement will be obtained <br /> for one well location proposed on private property Following the <br /> receipt of the encroachment permits and the access agreement for the <br /> proposed well locations, well installation permits will be obtained <br /> from the SJCEHD <br /> • Groundwater Monitoring Wells. Soil borings for monitoring wells <br /> will be drilled using 8-inch diameter hollow-stem augers Upon <br /> completion of drilling, a 2-inch diameter groundwater monitoring <br /> well will be Installed in each boring The wells will be screened from <br /> approximately 70 feet to 80 feet below ground surface (bgs), and <br /> completed at approximately 80 feet bgs Field procedures for the <br /> I\Tosco Markettng\4409\Work P1ans\Addrnonal Assessment WP doc <br />