Laserfiche WebLink
Since it was decided that further excavation, was not feasible, <br /> the removed spoil was remediated on site by aeration over a <br /> period of weeks. Laboratory analysis of the soil after treatment <br /> showed it to be clean, and the EHD authorized returning it to the <br /> excavation Refer to EXHIBIT G for a copy of that correspon- <br /> dence. <br /> October 4 & 5, 1990 - Five (5) auger holes were placed in an <br /> attempt to further define the plume. Four were located on Normac <br /> property, and one was located to the west of the tank site on <br /> property owned by Hammertown Partners. The locations of those 5 <br /> holes are shown on PLATE VI . Details are given in EXHIBIT C. <br /> April - 8 & 9, 1992 - Because the previous work had not determined <br /> the vertical & lateral extent of the contamination, six (6) <br /> additional auger holes were placed as shown on PLATES VI & VIII . <br /> The limits were defined except in a southerly direction on the <br /> Hammertown property. EXHIBIT D gives more details of the work <br /> performed. <br /> August 13 1992 - Three additional soil borings were located on <br /> Hammertown Partners property as shown on PLATE VI . EXHIBIT E <br /> discusses the results of that work, which revealed that Toluene <br /> was detected in all three holes at 40' bgl, which was the approx- <br /> mate water table level in the Spring of 1986. <br /> As a result of the above work, the County EHD staff had required <br /> that monitoring wells be installed to determine if the ground- <br /> water had been impacted by the leaking UST. During a recent <br /> meeting with members of the EHD staff, it was agreed that add- <br /> itional soil & water sampling might be sufficient to determine if <br /> the remaining residual contamination will pose a threat to the <br /> groundwater. The following workplan is designed to accomplish <br /> that task. <br /> WORKPLAN_FOR _ADVANCING_TWO (_2) SOIL BORINGS TO WITHIN 10-15 FEET <br /> OF THE WATER TABLE TAKING APPROPRIATE SAMPLES- AND DRIVING A <br /> WATER SAMPLING DEVICE INTO THE WATER -TABLE -IN ORDER TO OBTAIN A <br /> CLEAN UNCONTAMINATED WATER SAMPLE FOR ANALYSIS: <br /> 1. The approximate locations of the two (2) soil borings are <br /> shown on PLATES VII & VIII; the actual locations may vary <br /> slightly from those indicated. <br /> 2. Osterberg & Stewart drilling equipment will be used IL will <br /> be equipped with sufficient clean 5-foot lengths of 8 1/4" OD <br /> auger flights to allow the advancing and completing of each well <br />• without stopping to clean flights. If necessary, flights will be <br /> 3 <br />